Undercounter Dispenser and Ice machine E7UC100A/E7UD100A
17
Service
(continued) –––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
7.
Install compression nozzle:
§
Remove and inspect compression nozzle O-ring seal.
Replace if damaged in any way.
§
Clean O-ring groove. Lubricate O-ring with Petro-gel and
reinstall.
§
Install compression nozzle
(Fig. 21.1)
.
§
Install compression nozzle retainer
(Fig. 21.2)
.
§
Install M6 socket head allen screw
(Fig. 21.3)
.
Fig. 21
2
1
3
8.
Install transport tube
(Fig. 22.1)
.
9.
Tighten hose clamp
(Fig. 22.2)
.
Fig. 22
2
1
10.
Install gear motor:
§
Install main housing insulation
(Fig. 23.1)
.
§
Slide gear motor onto auger shaft
(Fig. 23.2)
.
§
Install two M6x90 allen screws
(Fig. 23.3)
.
Fig. 23
3
3
2
1