14. Stake out Line
Stake out line is used for stake out a required point at a designed distance from the base
line and for finding the distance from the baseline to a measured point.
14. 1 Define Baseline
【
Procedure of defining baseline
】
To perform stake out line, please define a baseline first. The baseline can be defined by
inputting coordinates of the two points.
1. Press F2: [
MENU
] on P2 of the basic measurement
mode.
2. Turn to P2, select “
2. Stake out line
”.
3. Input the instrument occupied data, see Ҥ6.1 Input
the occupied point data”.
4. Select “
2. Define baseline
”, following operations see “
§
13.1 Define baseline”
procedures 5, 6 and 7.
Menu P2
1.Point projection
2.Stake out line
3.Traverse
4.Inverse
5.Polarize
6.Repeat Measure
7.Arc staking out
Stake out line
1.Occ. Orientation
2.Define baseline
3.Stake out line
Offset
Length
Fill
Grade
2
nd
Pt
1
st
Pt
Baseline
Azimuth
Z
N
E
Cut