background image

www.fmiproducts.com

124379-01A

11

VENTING INSTALLATION

Continued

17" Min.

30" Min.

1" Min.

1" Min.

1" Min.

Opening "A"

Roof Opening 36" Models

Pitch

Slope

Opening 

"A" Max. 

Used Flashing

Model No. 

Flat

17"

V6F-10DM

0-6/12

26.6°

19"

V6F-10DM

6/12-

12/12

45.0°

24"

V12F-10DM

Roof Opening 42" and 50" Models

Pitch

Slope Opening 

"A" Max.

Used Flashing

Model No. 

Flat

19.5"

V6F-10DM

0-6/12

26.6°

22'

V6F-10DM

6/12-12/12

45.0°

27"

V12F-10DM

5.  Add  next  sections  of  pipe  until  end 

penetrates  roof  line.  Check  to  see  that 

proper clearances are maintained. Extend 

chimney by adding sections of double wall 

pipe until pipe is minimum of 30" above 

highest point of roof cutout. Termination 

and chimney must extend a minimum of 

36" above highest point where it passes 

through roof.

19.5" Min.

30" Min.

2" Min.

2" Min.

2" Min.

Opening "A"

Figure 15 - Roof Opening Measurements

Nail Only 

Outer 

Perimeter 

of Flashing

Storm Collar

Flashing

Cone

Underlap Shingles 

at Bottom

Overlap 

Shingles Top 

and Sides Only

Figure 16 - Flashing Installation

FLASHING INSTALLATION (V6F-10DM 

OR V12F-10DM)

Determine the flashing to be used with the roof 

opening chart. Slide flashing over pipe until 

base  is  flat  against  roof.  Replace  as  many 

shingles as needed to cover exposed area 

and flashing base. Secure in position by nail

-

ing through shingles (see Figure 16). DO NOT 

NAIL THROUGH FLASHING CONE.

Installing Flashing on a Metal Roof

When installing the flashing on a metal roof, 

it is required that putty tape be used between 

the flashing and the roof. The flashing must be 

secured to the roof using #8 x 3/4" screws and 

then sealed with roof coating to prevent leak

-

age through the screw holes. A roof coating 

must also be applied around the perimeter of 

the flashing to provide a proper seal.

Storm Collar Installation (SC2-1)

Place storm collar over pipe and slide down 

until it is snug against the open edge of the 

flashing  (see  Figure  17). Apply  waterproof 

caulk  around  the  perimeter  of  the  collar  to 

provide a proper seal.

Figure 17 - Storm Collar

Chimney 

Pipe

Waterproof 

Caulk

Storm 

Collar

Flashing

Summary of Contents for G36A Series

Page 1: ...with a vent free gas log heater approved to ANS Z21 11 2 standard This wood burning fireplace complies with UL127 CAN ULC S610 M87 standard as a FACTORY BUILT FIREPLACES FOR CANADA The authority havi...

Page 2: ...cation in fireplace and refer to fire log warnings and caution markings on packaging prior to use Thisfireplaceisnotintendedtobe used as a substitute for a furnace to heat an entire home Use for suppl...

Page 3: ...S 12 EACH SIDE COMBUSTIBLE WALL BOARD NO COMBUSTIBLE MATERIAL ON FACE MINIMUM 12 TO PERPENDICULAR SIDEWALL HEARTH EXTENSION 74 X 20 1 CHIMNEY AIRSPACE CLEARANCE TO COMBUSTIBLE MATERIAL OUTSIDE AIR 36...

Page 4: ...GAS LINE KNOCKOUTS 12 EACH SIDE COMBUSTIBLE WALL BOARD NO COMBUSTIBLE MATERIAL ON FACE MINIMUM 18 TO PERPENDICULAR SIDEWALL HEARTH EXTENSION 66 X 20 2 CHIMNEY AIRSPACE CLEARANCE TO COMBUSTIBLE MATERIA...

Page 5: ...OMBUSTIBLE MATERIAL COMBUSTIBLE WALL BOARD NO COMBUSTIBLE MATERIAL ON FACE 0 TO BOTTOM OUTSIDE AIR 11 2 AIR SPACE BACK AND SIDES GAS LINE KNOCKOUTS 12 EACH SIDE MINIMUM 18 TO PERPENDICULAR SIDEWALL HE...

Page 6: ...nges Figure 5 Corner Installation SELECTING LOCATION To determine the safest and most efficient location for the fireplace you must take into consideration the following guidelines 1 The location must...

Page 7: ...bustible material see Figure 6 WARNING Hearthextension is to be installed only as shown in Figure 6 FIREPLACE INSTALLATION Continued Figure 6 Hearth Extension Seal Gap Fireplace Front Ember Protector...

Page 8: ...ns Figure 8 Outside Air Kit Secure to Collars with Metal Tape Screws or Straps Min of 1 4 x 20 in size Air Inlet Location Must Allow For Bushes or Snow Vent Hood Required for Wall Installation Air Inl...

Page 9: ...ipe sections are locked to gether When installing double wall snap lock chimney together it is important to assure the joint between the chimney sections is locked Check by pulling chimney upward afte...

Page 10: ...igure 14 Firestop Spacer with Attic Space Above Ceiling Existing Ceiling Frame Firestop Spacer Screws or Staples Min of 8 Firestop Spacer Screws or Staples Min of 8 PENETRATING ROOF To maintain a 1 36...

Page 11: ...tom Overlap Shingles Top and Sides Only Figure 16 Flashing Installation FLASHING INSTALLATION V6F 10DM OR V12F 10DM Determine the flashing to be used with the roof opening chart Slide flashing over pi...

Page 12: ...2 Min 10 3 Min 2 Min 3 Min Level of Flue Gas Outlet Figure 20 10 Foot Rule Terminations Spark Arrestor The fireplace system must be terminated with the listed round top or chase terminations In any c...

Page 13: ...y should be postioned a distance apart as shown in Figure 21 4 Install rear refractory panel This panel has a top and bottom To determine which is which match up the pattern on the rear panel with the...

Page 14: ...la tion from gas line conduit sleeve Save insulation for reuse Replace screws 3 Run a 1 2 black iron gas line into fireplace through the rear at gas line conduit sleeve if usingaraisedplatform addheig...

Page 15: ...ce must comply with the Standard for Decorative Gas Appliance for Installation in Solid Fuel Burning Fireplaces ANS Z21 60 or Z21 84 and shall also be installed in accordance with the National Fuel Ga...

Page 16: ...Installing Bi Fold Doors Spring Clip Insert Pin into Spring Clip Pivot Hole Insert Bottom Pivot Pin into Hole Fold Door and Slide Top Pins Into Track Figure 29 Adjusting Bi Fold Doors INSTALLING GLAS...

Page 17: ...and a gradual temperature rise to 550 F which is more than a normal fire will generate Such materials as pitch wax laden logs very dry mill end lumber and large amounts of paper or cardboard boxes can...

Page 18: ...www fmiproducts com 124379 01A 18 PARTS MODELS V G36 42 50 SERIES AND V J36 42 50 SERIES 1 21 20 5 6 7 10 9 11 12 13 16 17 15 14 8 24 23 3 25 18 2 22 19 4...

Page 19: ...e 2 15 21171 Gas Conduit Cover 4 16 109752 01 Conduit One 2 17 109752 02 Conduit Two 2 18 Heat Shield Support 1 19 123298 02 Ash Box Assembly 1 20 Inner Dome Assembly 1 21 Smoke Shield 1 22 Damper Con...

Page 20: ...www fmiproducts com 124379 01A 20 PARTS MODELS MODELS V G36 42 50 SERIES AND V J36 42 50 SERIES Picture may vary from actual 1 2 5 3 4 6 6...

Page 21: ...1 125841 02 Right Herringbone 50 Red 1 3 116081 02 Left Stacked 36 Red 1 116086 02 Left Herringbone 36 Red 1 125833 02 Left Stacked 42 Red 1 125836 02 Left Herringbone 42 Red 1 125839 02 Left Stacked...

Page 22: ...116081 01 Left Stacked 36 Natural White 1 116086 01 Left Herringbone 36 Natural White 1 125833 01 Left Stacked 42 Natural White 1 125836 01 Left Herringbone 42 Natural White 1 125839 01 Left Stacked 5...

Page 23: ...tion or troubleshooting If so contact FMI PRODUCTS LLC at 1 866 328 4537 When calling please have your model and se rial numbers of your fireplace ready You can also visit our web site at www fmiprodu...

Page 24: ...FLASHING V6F 10DM 0 to 6 12 Pitch V12F 10DM 6 12 to 12 12 Pitch ACCESSORIES Continued SQUARE CHASE TOP TERMINATION STL 12D AND STL 12DMP BLACK ROUND TOP TERMINATIONS RLT 12D AND RLT 12HT STORM COLLAR...

Reviews: