Page 4 • MNFG003
Issue/Rev. 0.0 (2/10)
Section II – Display and Controls
Power Up
The following describes the events which occur when the power is applied to a microFlow.net Gas. Upon power up
the microFlow.net Gas goes through a start up sequence. The start up screen will be displayed while a RAM test is
being performed.
After initialization, the microFlow.net Gas will display the default screen based on the configuration set by the user.
See the Operator Reference Manual (MNFG002) for more detail regarding the selection of the default display.
The “ALARM” message will blink at the bottom of all run-time screens if an alarm conditions exists.
Otherwise, the “MORE” message will be present at the bottom of all run-time screens.
Once the initial screen is displayed, the operator can scroll through other run-time screens by pressing the right/
left cursor buttons. This will sequence through the following screens. If the programming calls for a user config-
ured display to be the initial run-time screen shown at power-up, it will be included in the following sequence of
displays.
FMC
microFlow.net Gas
RAM test
__________________
Figure 2.
Power Up Screen
microFlow.net Gas
GSV Batch Forward
0 MCF
GSV Batch Reverse
0 MCF
< - MORE - >
microFlow.net Gas
GV Batch Forward
0 MCF
GV Batch Reverse
0 MCF
< - ALARM - >
Summary of Contents for Smith Meter microFlow.net Gas
Page 4: ...ii ...