3.

 

Sand the area that is to be below the blocks well. 

 
4.

 

Paint the sanded area of the hull where the blocks will be attached with the resin and then lay in the small mat 
patch 

 

Note:  We recommend polyester resin with a small amount of gel coat mixed in to color the resin so that it more closely 
matches the surrounding area.  Epoxy resin may be used in place of the polyester resin, however, epoxy resin may not wet 
out the mat patches as well. 

 

5.

 

Paint the wood block with the resin and press it onto the mat patch with enough pressure to squeeze a small 
amount of resin from under the block. 

 
6.

 

Lay the large mat and roving patch over the block with the roving on top and wet it out with the resin. 

 

Note:  Be sure to work out any trapped air so that the glass fits tightly over the wood block.  A 3” disposable bristle paint 
brush works well for wetting out the glass patches.  Be sure to have some acetone on hand for clean up. 

 

7.

 

Allow to cure 24 hours 

 

 

Web Strap Installation 

 
1.

 

Check the entire area where the bag is to be installed and lightly sand any rough or sharp glass edges 

 
2.

 

Lay the uninflated bag into the bow and attach the forward flotation tang to the lower part of the bow block 
(the glassed in block where the jib and forestay toggle is attached) using a 9/64” drill bit 

 

Note:  Be sure not to drill more than 3/4” deep.  A hole drilled too deep can easily go through the bow and show on the 
outside. 

 
3.

 

Screw the tang down using the washer on the center screw. 

 

 