4.
Fly Mission
4.1
Take-off and landing site selection
(1)
Take-off clearance requirements The take-off clearance requirements are in
the blue area as shown in the figure below. It must be ensured that there are
no obstacles in the blue area. The radius of 50 meters in front of the take-off
point, and the fan shape of 30° to the left and right must be an absolute
clearance area.
(2)
landing clearance requirements
When entering the landing path, there must be no obstacles within 15 meters
to the left and right of the landing direction.
When entering the landing route,
there must be no obstacles in the area where the landing vertical section is
shown in blue. In addition, it is necessary to meet the requirement that there
are no obstacles within a radius of 10 meters from the landing point.
Summary of Contents for FDG30
Page 6: ...Click on Connect Drone...