5128A
Operators Manual
8
Product Setup
The subsequent sections explain Product inspection, placement, and setup.
Unpack and Inspect
Unpack the Product carefully and examine it for damage that could have
occurred during shipment. If there is shipping damage, contact Fluke Calibration
and the postal carrier immediately. Table 2 lists the equipment and the
accessories that come with the Product. Make sure that all the items are in the
box.
Table 2. Shipping Contents
Name Quantity
Mains Power Cord 2-meter (6-foot)
1
5128A Safety Information
(multi-language)
1
Report of Calibration and calibration label
1
Fill syringe with extension tube
1
Five-port square chamber door
1 (installed on the Product)
Port plug
5 (installed on each probe port)
Silicone Unit Under Test (UUT) grommets, ¼ in, ½ in, ¾ in, 1 in
One of each size, 4 in total
Desiccant cartridge
1 (installed inside the Product)
USB Cable (Type A to Type B)
1
Product Placement
Put the Product on a clean, flat surface. For best results, choose a location
where room temperature changes are minimal. Make sure that there is at least
100 mm (4 in) clearance at the back of the Product for adequate air flow.
Caution
To avoid damage to the Product, only use it in its horizontal position. When
in use, if the Product is tilted more than 10 degrees from horizontal, water
can leak from the internal humidifier
.