fluimac P07 User Manual Download Page 42

 

 

42 Rev. 03 

 

It should be noted that it is very important to realize systems with pipes well arranged, identifiable, suitably equipped with shut-off 
valves, with comfortable compartments and passages for operators who must inspect their status (since the pressure developed by 
the pump may promote failures to the system if it is of defective construction or worn). 

OPERATORS FOR INSTALLATION AND START-UP 

interventions to be carried out only by skilled personnel who may delegate to others some operations in accordance with specific 
evaluations (required technical skills: plumbing, pneumatic and/or electric qualification as appropriate) 

OPERATORS FOR USE AND MAINTENANCE 

interventions to be carried out by generic operators (after being instructed on the correct use of the equipment): 
- pump start-up/stop 
- valves opening / closing with stopped pump 
- casing emptying and washing by means of the prearranged valves and pipes 
- filtering elements cleaning interventions to be carried out by skilled personnel (required technical skills: general knowledge of   
  the mechanical, electrical, chemical aspects of the equipment supplied by the pump and of the pump itself): 
- environmental conditions check 
- pumped fluid conditions check 
- inspections of start-up/stop devices 
- detection of malfunctions 

OPERATORS FOR REPAIR 

work to be carried out by generic operators supervised by skilled personnel: 
- pump stop 
- valves closing 
- emptying of pump casing 
- pipes disconnection from the connections 
- unlocking of fastening screws to the base 
- washing with water or suitable solvent as appropriate 
- transport 
Work to be carried out by skilled personnel (required technical skills: notions of mechanical processing, sensitivity with regard to 
damage to parts for impacts or abrasions during handling, familiar to tighten bolts on different plastic/metal materials, use of 
precision measuring instruments): 
- casing opening and reclosing 
- removal and replacement of damaged parts 

DISPOSAL 

For type of material: separate plastic parts from metal parts and dispose of by authorized companies. 

TROUBLESHOOTING AND POSSIBLE CAUSES 

 

 

DEFECT 

CAUSE 

SUGGESTION 

The pump 

does not start 

Circuit without air 

Check the circuit (valves, connections, regulators, etc.) 

Insufficient air pressure 

Adjust the air pressure 

Insufficient air flow rate 

Check that the pipes and fittings have suitable passages 

Damaged control valve 

Replace 

Damaged pneumatic 

distributor 

Replace 

Pump delivery or intake 

closed 

Open some valves, or remove the pipes and check if the pump starts 

Damaged discharge cover 

Replace 

Broken diaphragm 

Check if air comes out of the product delivery pipe, if yes replace the 

diaphragm. 

The pump 

works butit 

does not 

pump. 

The balls do not close. 

Disassemble the manifolds and clean the seats or replace the balls and the 

seats. 

Excessive intake height. 

Reduce the intake height. 

Too viscous fluid. 

Install pipes with greater size especially for intake and decre- ase the pumps 

cycles. 

Clogged intake. 

Check and clean. 

The pump 

works with 

slow cycles 

Excessively viscous fluid. 

No remedy. 

Clogged delivery pipe. 

Check and clean. 

Clogged intake. 

Check and clean. 

The pump 

works 

irregularly. 

Internal pneumatic 

exchanger clogged or 

defective 

 

Replace the pneumatic exchanger. 

Worn shaft. 

Replace the pneumatic exchanger. 

Summary of Contents for P07

Page 1: ...USER MANUAL ENGLISH ITALIANO FRAN AIS DIAPHRAGMS PUMPS PUMPS PHOENIX PHOENIX ATEX PHOENIX FOOD PHOENIX FOOD ATEX...

Page 2: ...2 Rev 03...

Page 3: ...e code d identification 6 LEGEND AND TECHNICAL DATA legenda e dati tecnici l gende et caract ristiques techniques 6 P07 8 P18 10 P30 12 P50 14 P65 16 P100 18 P101 20 P160 22 P170 P252 PF170 24 P250 26...

Page 4: ...SO 4414 2012 Safety of the machinery Safety requirements concerning the systems and their components for hydraulic and pneumatic transmissions Pneumatic UNI CEI EN ISO 80079 36 2016 Apparecchi non ele...

Page 5: ...ial and model abbreviation and the serial number on the rating plate applied onto the support side Check these data upon receiving the goods Any discrepancy between the order and the delivery must be...

Page 6: ...Kg Min Max Temperature PP 129 65 112 54 96 102 86 18 5 5 5 5 14 57 0 7 4 C 65 C PVDF CF 129 65 112 54 96 102 86 18 5 5 5 5 14 57 0 9 20 C 95 C POMc 129 65 112 54 96 102 86 18 5 5 5 5 14 57 0 9 5 C 80...

Page 7: ...tore superiore Upper manifold 1 12a P0007CLR00005PM POM VTR Collettore superiore Upper manifold 1 12a P0007CLR00005OC POM CF Collettore superiore Upper manifold 1 12a P0007CLR00005FC PVDF CF Collettor...

Page 8: ...50 47 130 55 6 20 1 1 4 C 65 C PVDF CF 146 93 164 50 47 130 55 6 20 1 4 20 C 95 C POMc 146 93 164 50 47 130 55 6 20 1 1 5 C 80 C PP CF 146 93 164 50 47 130 55 6 20 1 1 4 C 65 C AISI 316 148 85 153 47...

Page 9: ...CLR05090PP PP VTR Collettore inferiore Lower manifold 1 12b P0018CLR05090PC PP CF Collettore inferiore Lower manifold 1 12b P0018CLR05090PM POM VTR Collettore inferiore Lower manifold 1 12b P0018CLR05...

Page 10: ...6 5 20 1 4 4 C 65 C PVDF CF 177 105 183 86 124 146 30 6 5 20 1 7 20 C 95 C POMc 177 105 183 86 124 146 30 6 5 20 1 4 5 C 80 C PP CF 177 105 183 86 124 146 30 6 5 20 1 4 4 C 65 C AISI 316 181 106 192...

Page 11: ...CF Collettore inferiore Lower manifold 1 12b P0030CLR00018PM POM VTR Collettore inferiore Lower manifold 1 12b P0030CLR00018OC POM CF Collettore inferiore Lower manifold 1 12b P0030CLR00018FC PVDF CF...

Page 12: ...10 185 59 7 27 4 4 C 65 C PVDF CF 223 156 233 110 110 185 59 7 27 4 5 20 C 95 C PP CF 223 156 233 110 110 185 59 7 27 4 5 4 C 65 C ALU 222 156 230 110 110 183 59 7 26 5 20 C 90 C AISI 316 222 156 230...

Page 13: ...d 2 13 P0050GA004807PP PP VTR Gabbia Ball cage guide 4 13 P0050GA004807EC ECTFE Gabbia Ball cage guide 4 14 SFERAINC07008TF PTFE Sfera Ball 4 14 SFERAINC07008A4 AISI 316 Sfera Ball 4 14 SFERAINC07008D...

Page 14: ...ax Temperature PP 265 175 245 108 168 189 50 9 29 6 5 4 C 65 C PVDF CF 265 175 245 108 168 189 50 9 29 7 20 C 95 C PP CF 265 175 245 108 168 189 50 9 29 7 4 C 65 C ALU 265 175 245 108 168 189 48 9 29...

Page 15: ...Ball cage guide 4 14 SFERAINC07008TF PTFE Sfera Ball 4 14 SFERAINC07008A4 AISI Sfera Ball 4 14 SFERAINC07008DT EPDM Sfera Ball 4 14 SFERAINC07008NR NBR Sfera Ball 4 15a P0065SD005095PP PP Sede sfera c...

Page 16: ...8 175 189 50 9 29 6 5 4 C 65 C PVDF CF 265 175 245 108 175 189 50 9 29 7 20 C 95 C PP CF 265 175 245 108 175 189 50 9 29 7 4 C 65 C ALU 265 175 245 108 174 189 50 9 29 7 20 C 90 C AISI 316 250 175 250...

Page 17: ...d 2 12a F0100CLR04297A4 AISI 316 Collettore superiore CLAMP Upper manifold CLAMP 2 12b F0100CLR04303A4 AISI 316 POLISHED Collettore inferiore CLAMP Lower manifold CLAMP 2 13 P0050GA004807PP PP VTR Gab...

Page 18: ...P101 PHOENIX P101 A B C D E H Q S T Weight Kg Min Max Temperature PP 291 175 245 108 175 189 73 9 29 6 5 4 C 65 C PVDF CF 291 175 245 108 175 189 73 9 29 6 5 20 C 95 C PP CF 291 175 245 108 175 189 73...

Page 19: ...4 SFERAINC07008TF PTFE Sfera Ball 4 14 SFERAINC07008A4 AISI Sfera Ball 4 14 SFERAINC07008DT EPDM Sfera Ball 4 14 SFERAINC07008NR NBR Sfera Ball 4 15a P0065SD005095PP PP Sede sfera con o ring N 41 Ball...

Page 20: ...294 69 9 39 15 4 C 65 C PVDF CF 370 222 370 157 238 294 69 9 39 16 20 C 95 C PC CF 370 222 370 157 238 294 69 9 39 16 4 C 65 C ALU 370 222 364 157 238 286 69 9 39 16 20 C 90 C AISI 316 360 222 346 12...

Page 21: ...superiore CLAMP Upper manifold CLAMP 2 12b F0160CLR04305A4 AISI 316 POLISHED Collettore inferiore CLAMP Lower manifold CLAMP 2 13 P0160GA004234EC ECTFE Gabbia Ball cage guide 4 14 SFERAMMC04000TF PTFE...

Page 22: ...B C D E H Q S T Weight Kg Min Max Temperature P170 AISI 316 356 5 222 371 129 254 293 5 66 9 46 20 20 C 95 C P252 AISI 316 356 5 222 371 129 254 293 5 66 9 46 20 20 C 95 C AISI 316 FOOD TRI CLAMP 1 1...

Page 23: ...0CLR00193A4 AISI 316 Collettore superiore Upper manifold 2 12b P0170CLR00194A4 AISI 316 Collettore inferiore Lower manifold 2 12a P0252CLR00197A4 AISI 316 Collettore superiore Upper manifold CLAMP 2 1...

Page 24: ...Max Temperature PP 370 222 372 157 238 296 69 9 39 15 4 C 65 C PVDF CF 370 222 372 157 238 296 69 9 39 16 20 C 95 C PC CF 370 222 372 157 238 296 69 9 39 16 4 C 65 C ALU 370 222 364 157 238 286 69 9 3...

Page 25: ...re Lower manifold 2 13 P0160GA004234EC ECTFE Gabbia Ball cage guide 4 14 SFERAMMC04000TF PTFE Sfera Ball 4 14 SFERAMMC04000A4 AISI Sfera Ball 4 14 SFERAMMC04000DT EPDM Sfera Ball 4 14 SFERAMMC04000NR...

Page 26: ...P400 A B C D E H Q S T Weight Kg Min Max Temperature PP 454 260 562 190 265 400 104 13 87 18 4 C 65 C PVDF CF 454 260 562 190 265 400 104 13 87 22 20 C 95 C PP CF 454 260 562 190 265 400 104 13 87 40...

Page 27: ...CF Collettore superiore inferiore 1 1 2 Upper lower manifold 1 1 2 2 12 P0400CLR00204AL ALUMINUM Collettore superiore inferiore 1 1 2 Upper lower manifold 1 1 2 2 13 P0400GA000069PP PP Gabbia Ball cag...

Page 28: ...03 PHOENIX 400 AISI VERSION PHOENIX P400 AISI A B C D E H S T Weight Kg Min Max Temperature AISI 361 260 502 165 211 418 9 52 40 20 C 95 C AISI 316 FOOD TRI CLAMP 2 361 260 502 165 211 418 9 52 40 20...

Page 29: ...0CLR00114A4 AISI Collettore superiore 1 1 2 Upper manifold 1 1 2 1 12a F0400CLR00117A4 AISI 316 POLISHED Collettore superiore CLAMP 2 Upper manifold CLAMP 2 1 12b P0400CLR00115A4 AISI Collettore infer...

Page 30: ...0 A B C D E H Q S T Weight Kg Min Max Temperature PP 595 345 565 213 399 392 115 12 5 95 31 4 C 65 C PVDF CF 595 345 565 213 399 392 115 12 5 95 36 20 C 95 C PC CF 595 345 565 213 399 392 115 12 5 95...

Page 31: ...Ball cage guide 4 13 P0700GA004362EC ECTFE Gabbia Ball cage guide 4 14 SFERAMMC00060TF PTFE Sfera Ball 4 14 SFERAMMC00060A4 AISI 316 Sfera Ball 4 14 SFERAMMC00060DT EPDM Sfera Ball 4 14 SFERAMMC00060...

Page 32: ...HOENIX PN700 AISI VERSION PHOENIX PN700 AISI A B C D E H S T Weight Kg Min Max Temperature AISI 487 340 599 220 302 496 12 63 46 20 C 95 C AISI 316 FOOD TRI CLAMP 2 1 2 487 340 598 220 302 496 12 63 4...

Page 33: ...e AISI CLAMP Upper AISI CLAMP manifold 1 12b PN700CLR00108A4 AISI 316 Collettore inferiore AISI Lower manifold AISI 1 12b FN700CLR00109A4 AISI 316 POLISHED Collettore inferiore AISI CLAMP Lower AISI C...

Page 34: ...34 Rev 03 PHOENIX 1000...

Page 35: ...ollettore di mandata 2 705 1 803 Suction Manifold collettore di aspirazione 1 753 8001 Ball sfera 4 752 8002 Ball seat sede sfera 4 412 2 8003 O ring 2 193 80M01 Air Valve Cap tappo valvola pneumatica...

Page 36: ...TALLATION AND USE INSTRUCTION TRANSPORT STORAGE INSTALLATION START UP USE STOP 40 MAINTENANCE RECOMMENDATIONS DISASSEMBLY INSPECTION 40 SAFETY RISKS 42 OPERATORS FOR INSTALLATION AND START UP OPERATOR...

Page 37: ...1 5 times the head value with closed delivery The value of the vapor pressure of the pumped fluid must be greater of at least 3 mwc meters of water column than the difference between the total absolu...

Page 38: ...n foreign bodies and all the seals on the hydraulic connections must be removed before starting the pump check the tightness of the screws of the pump bodies and manifolds according to the following s...

Page 39: ...n the air circuit set the operation point requested for the pump properly adjust the air pressure and delivery that supplies the pump With pressure values under 2 bar the pump may stall with pressure...

Page 40: ...matic distributor removal slip off the pneumatic exchanger cap and the spool if necessary use a M6 screw for slip off the spool PHOENIX 07 18 30 50 remove the manifolds pump casing and diaphragms remo...

Page 41: ...ps must always be grounded irrespective of any organ to which they are connected Lack of grounding or incorrect grounding will cancel the requirements for safety and protection against the risk of WAR...

Page 42: ...suitable solvent as appropriate transport Work to be carried out by skilled personnel required technical skills notions of mechanical processing sensitivity with regard to damage to parts for impacts...

Page 43: ...s depends on the quick couplings Defective distributor Replace it The stop procedure was not respected Respect the stop procedure 6 The pump does not deliver the flow rate indicated on the table The p...

Page 44: ...IONE ED USO TRASPORTO STOCCAGGIO INSTALLAZIONE AVVIAMENTO UTILIZZO ARRESTO 48 MANUTENZIONE RACCOMANDAZIONI SMONTAGGIO ISPEZIONE 48 PRESCRIZIONI PER LA SICUREZZA 50 OPERAZIONI PER INSTALLAZIONE E AVVIA...

Page 45: ...i vapore del liquido pompato deve essere superiore di almeno 3 m c a alla differenza tra il battente totale assoluto pressione sul livello in aspirazione sottratta dell altezza di aspirazione e le per...

Page 46: ...di collegare la pompa la pompa non deve contenere corpi estranei e devono essere rimossi i sigilli sulle connessioni idrauliche prima di avviare la pompa verificare il serraggio delle viti dei corpi p...

Page 47: ...unto di funzionamento per il quale la pompa stata richiesta regolare opportunamente la pressione e la portata dell aria che alimenta la pompa Con pressioni inferiori ai 2 bar la pompa pu andare instal...

Page 48: ...elli 65 100 101 160 250 500 700 1000 Rimuovere la vite di bloccaggio posizionata nella parte inferiore del canotto trasversale del corpo centrale Ribaltare la pompa ed aiutandosi con un punzone da 6 m...

Page 49: ...temperatura massima ammessa di processo In caso di superamento non garantito il rispetto della massima temperatura di marcatura ATTENZIONE la pompa deve essere sempre messa a terra indipendentemente d...

Page 50: ...caggio viti di fissaggio al basamento lavaggio con acqua o adeguato solvente secondo il caso trasporto interventi da personale qualificato capacit tecnica richiesta nozioni di lavorazione meccanica se...

Page 51: ...innesto rapido Controllare che tutti i dispositivi di controllo aria abbiano portata sufficiente ATTENZIONE Nel 90 i casi di stallo dipendono dagli innesti rapidi Distributore difettoso Sostituirlo N...

Page 52: ...RANSPORT STOCKAGE INSTALLATION D MARRAGE UTILISATION ARR T 56 MAINTENANCE RECOMMANDATIONS D MONTAGE INSPECTION 58 CONSIGNES DE S CURIT 58 OP RATIONS POUR L INSTALLATION ET LE D MARRAGE OP RATEURS CHAR...

Page 53: ...signal tique La valeur de la tension de vapeur du liquide pomp doit tre sup rieure d au moins 3 m environ la diff rence entre la charge totale absolue pression sur le niveau en aspiration moins la ha...

Page 54: ...le circuit avant de brancher la pompe la pompe ne doit pas contenir de corps trangers les scell s sur les raccordements hydrauliques doivent tre retir s avant de d marrer la pompe v rifier le serrage...

Page 55: ...ir la vanne 3 voies sur le circuit d air Configurer le point de fonctionnement pour lequel la pompe a t requise r gler la pression et le d bit d air d alimentation de la pompe de mani re appropri e Av...

Page 56: ...voir retir les collecteurs les corps de pompe et les membranes retirer les boulons de blocage des 2 demi corps et les s parer Mod les 65 100 101 160 250 500 700 1000 Retirer la vis de blocage situ e d...

Page 57: ...raccord L absence de mise la terre ou une mise la terre incorrecte annule les exigences de s curit et de protection du danger d explosion ATTENTION pour les liquides inflammables il est interdit d uti...

Page 58: ...asions pendant la manipulation ma trise du serrage des visseries sur diff rents mat riaux tels que plastique ou m tal utilisation d appareils de mesure de pr cision ouverture et fermeture du corps d m...

Page 59: ...les dispositifs de contr le d air ont un d bit suffisant ATTENTION Dans 90 les cas de blocage d pendent des raccords rapides Distributeur d fectueux Le remplacer La proc dure d arr t n a pas t respec...

Page 60: ...mpa il quale deve prenderne attenta visione e conservarlo per successive consultazioni Eventuali modifiche non comportano l aggiornamento dei manuali preesistenti FLUIMAC srl Draw and text total or pa...

Reviews: