16
ALLOW AMPLE THREADED
BOLT LENGTH ABOVE
ROUGH CONCRETE
STUFF WASTE AROUND
BOLT WHILE POURING
CONCRETE
PIPE SLEEVE TO BE
THREE TIMES DIAMETER
OF ANCHOR BOLT
ROUGH FINISH
FOR GROUT
WELD A LARGE WASHER
WITH LUGS TO THE
BOTTOM OF BOLT
AND PIPE SLEEVE TO
PREVENT TURNING
Fig. 2 Arrangement of foundation bolt in foundation
2.3 Level the baseplate
Before putting the unit on the foundation, thoroughly clean the top of the foundation. Break off any
loose pieces of cement and roughen the top with a chisel to afford a good hold for grout.
NOTE
Coupling bolting and spacer piece must be removed from between the pump and driver half
couplings before lifting baseplate with pumping element
NOTE
When lifting baseplate with pumping element, sling baseplate from all lifting eyes provided.
Refer to Section 1.26.
Prepare sufficient steel plates to be placed below each baseplate jacking screw furnished with the
baseplate. The purpose of the plate is to spread the load of the screw without crushing the
concrete below.