The RTD can be installed on the upstream or downstream sections of FS, but installa-
tion on the downstream section is preferable. While installing the RTD after FS, the distance
between the bush and FS should be not less than 5 DN and at installation before FS - not less
than 10 DN.
After bush welding, it is necessary to process its thread by tap
М
10
х
1.5 or
М
16
х
1.5
(depending on bush type).
While installing the RTD with inclination 45°
or 60°,
it is necessary to drill 10 mm hole
(16 mm for a thermal pocket) and to saw it up to a necessary oval depending on thickness of
a pipe wall (see figure 9.7).
The sealing surface of the bush should be protected from splashes of the fused metal
during welding.
Before application of sealing gasket (fluoroplastic ring) a sealing surface of the bush
should be greased.
While screwing the RTD in the bush, the force put to a wrench of 200 mm length,
should be no more than 5 kg and provide hermetic seal. The deformation of fluoroplastic
gasket in the gap between sealing surfaces of RTD and the bush is not permitted.
Before screwing the RTD in the thermal pocket it is necessary to be convinced of clean-
liness of a thermal pocket and to fill it on 1/8 of volume with high-temperature silicon lubri-
cant of any type.
Т
able 9.2
DN,
mm
Configuration of R
Т
D,
nominal length
(L
TD
, mm), type
Configuration variants for bushes of first
type (internal thread of bushes is
М
10
х
1.5)
Angle
of incli-
nation
Labeling
Marking
32
SMP.405212.001-03
L
RTD
=58; type 4
SMP.723144.007
1
45
°
50
SMP.723144.008
2
60
°
65
SMP.723144.009
3
90
°
80
100
SMP.405212.001-01
L
RTD
=80; type 2
125
45
°
150
SMP.405212.001-02
L
RTD
=150; type 3
SMP.723144.007
1
60
°
Summary of Contents for SVTU-11B
Page 1: ...Water meter SVTU 11B Operating manual SMP 407251 010 Part 1 September 2010...
Page 2: ......
Page 29: ...29 Figure 9 7 Installation of R D S of type 2 3 and 4 without thermal pocket...
Page 30: ...30 Figure 9 8 Installation of R D S of type 2 3 and 4 with thermal pocket...
Page 37: ...37 Figure 11 1...
Page 40: ...40 Figure 121 1...
Page 49: ...49 Appendix C Overall and connecting dimensions of calculator 17...
Page 51: ...51...
Page 52: ...52 Indication of main parameters mode...
Page 53: ...53 Check mode...
Page 54: ...54 Setup mode...
Page 55: ...55 Setup Set zero mode Setup PS parameters mode...
Page 56: ...56 Setup Pressures mode...
Page 61: ...61 Schematic of device cable...
Page 62: ...62 Pinout of connectors...
Page 64: ...64 Appendix L Overall and connecting dimensions for flow measurement sections FS...
Page 65: ...65 Overall and connecting dimensions for FS 32...