Table 9.4
Cable function
(connected unit)
Marking on device
cable
Marking on flow sensor cable outlets
Marking
Arrangement
FlS1 of channel 1
A11
11
First downstream
FlS2 of channel 1
A12
12
Second downstream
FlS1 of channel 2 (FlS3)
A21
21
First downstream
FlS2 of channel 2 (FlS4)
A22
22
Second downstream
In Table 9.5 marking on communications channels of device cable is given to connect
temperature sensors, pressure transducers and peripheral devices.
Table 9.5
Cable function
(connected unit)
Marking on device cable
Cable function
(connected unit)
Marking on device cable
Т
S1
B1
PT1
C1
Т
S2
B2
PT2
C2
Т
S3
B3
RS232
D1
Pulse outputs
D4
Structural and basic schemes of device cable are given in the appendix F.
After meter commissioning and also in cases of repairs, verification and adjustments,
service worker should record corresponding information in Table 19.
CAUTION!
IT IS FORBIDDEN:
1 To break the procedure of cable connection according to marking in tables 9.4 – 9.6.
2 To swap RTD of temperature sensors
Т
S1,
Т
S2,
Т
S3 (see the Appendix B) and pres-
sure sensors PT1 and PT2.
3 To increase or shorten the length of cables of ultrasonic flow sensors FlS.
4 To apply FS, RTD, ultrasonic flow sensors FlS and calculators from different deli-
very sets.
5 Cable twisting, kinking and sharp bends is not permitted while connecting to FlS.
CAUTION!!!
If it was required to make welding during device commissioning, the meter should
be switched off and device cable should be disconnected from the calculator housing.
Otherwise the meter can be damaged.
10
Setting-up Procedures
10.1
While meters work with additional devices (PC), these devices should be connected
to meters strictly according to maintenance documentation.
10.2
For comfortable work with the meter (after its purchase and before installation) and
for check of meter working capacity together with ultrasonic flow sensors it is necessary:
1) Assemble a flow meter section with rubber or paronite gasket (thickness of 1-2
mm) and technological cap at the end face, install it vertically, fix flow sensors, and
completely fill FS with water.
2) Check up all items in
«Indication of main parameters»
mode, check up all items
in
"Check"
mode
and also it is obligatory to provide zero setting in
"Setup"
mode
to
Summary of Contents for SVTU-11B
Page 1: ...Water meter SVTU 11B Operating manual SMP 407251 010 Part 1 September 2010...
Page 2: ......
Page 29: ...29 Figure 9 7 Installation of R D S of type 2 3 and 4 without thermal pocket...
Page 30: ...30 Figure 9 8 Installation of R D S of type 2 3 and 4 with thermal pocket...
Page 37: ...37 Figure 11 1...
Page 40: ...40 Figure 121 1...
Page 49: ...49 Appendix C Overall and connecting dimensions of calculator 17...
Page 51: ...51...
Page 52: ...52 Indication of main parameters mode...
Page 53: ...53 Check mode...
Page 54: ...54 Setup mode...
Page 55: ...55 Setup Set zero mode Setup PS parameters mode...
Page 56: ...56 Setup Pressures mode...
Page 61: ...61 Schematic of device cable...
Page 62: ...62 Pinout of connectors...
Page 64: ...64 Appendix L Overall and connecting dimensions for flow measurement sections FS...
Page 65: ...65 Overall and connecting dimensions for FS 32...