Transport, mounting and first commissioning
2.1/1
Transport
During transport of the centrifuge observe the regulations for safety at work.
Lifting of the centrifuge is only allowed with checked lifting devices.
For weight and suspension points refer to the installation plan, which is included in the
planning documents.
Mounting and first commissioning
The proper control of the installation and the optimisation of the adjustment of the
machine and plant during commissioning is condition for a safe and economic operation.
Attention has to be paid to the following rules for the first commissioning and safety.
Authorised persons
Faulty installation and commissioning of the centrifuge
may cause dangerous operating conditions, which will
result in severe damages and danger to persons.
The first commissioning has to be executed by an
authorised technical expert.
Before the first commissioning the centrifuge has to be checked for proper installation,
equipment and readiness for operation by an authorised technical expert. (Instructed)
operational personnel which is working by means of the operating instructions is
considered as not authorised.
Therefore we recommend that a Flottweg-technician will perform the installation, first
commissioning, optimisation of the adjustment and instruction of the personnel.
Check before commissioning (by an authorised technical expert)
1. Location
2. Acceptability of means of transport
3. Check if transportation locks are removed (see 2.1/2)
4. Connections to the machine
5. Signs on the machine
6. Transport systems of liquids and solids
7. Does the product correspond to the specification
8. Function of the safety installations (belt guard, covers)
9. Sense of rotation of the motors
10. Function of the limit value control
11. Switching sequence, locking
12. Function of the central lubrication system (see 3.2/1)
13. Inertisation (if existing)
Optimisation during commissioning (by an authorised technical expert)
-
Optimum adjustment of the machine (parameter)
-
Observation regarding product deposits and optimisation
of the rinsing program (intervals, time, quantity)
-
Observation regarding wear/corrosion
CAUTION
U
k-
2
_
1
_
1
-3
x8
_
T
ra
n
s_
1
0
0
4
0
7
-P
re
-V
i-
sw
Summary of Contents for TRICANTER Z 8E
Page 5: ...Flottweg 1 GENERAL Uk1 allg_030107 Pre...
Page 15: ...Flottweg 2 OPERATION Uk2 allg_030107 Pre...
Page 24: ...Flottweg 3 LUBRICATION AND INSPECTION Uk3 allg_030107 Pre...
Page 37: ...Flottweg 4 OPERATING TROUBLES Uk4_1 allg_030107 Pre...
Page 44: ...Flottweg 5 TABLES AND DIAGRAMS Uk5 allg_030107 Pre...