
IT
EN
EN - 4
2.2.b - Pad assembly (Figs. 6/9)
- Tilt the machine, pivoting, with the handle
straight (9), with your feet on the wheels
(10) and place it on the handle (Fig. 6).
- Unscrew the ring nut (11) using the han-
dle (12) supplied (Fig. 7).
- Mount the pad (13) on the pad holder
(14) (Fig. 9).
- Centre the pad (13) with the central guide
(15) on the pad holder (14) and make
sure the outer perimeter of the pad (13)
corresponds with the outer perimeter of
the pad holder (14) and then lock it on
the pad holder’s teeth pressing down with
your fingers (Figs. 8-9).
- Use the pad for high-speed polishing
(Gorilla or Cream Colour).
WARNING:
Use only pads supplied by the manufac-
turer for the specific machine model.
Using other types of pads can compro-
mise the safety of the machine.
2.2.c - Electrical spray accessory
assembly (Optional)
(Figs. 10/16)
- Loosen the knob (16) of the handle’s up-
per support (17) (Fig. 10).
- Make sure that the lower support (18)
rests on the plate (19) located on the han-
dle rod (Fig. 11).
- Place the accessory (20) on the lower
support (18), taking care to align the cou-
pling tab (21) with its housing (22) (Fig.
12).
- Lower the upper coupling (23) and attach
it to the coupling tab (24) on the top of the
accessory (20) (Fig. 13).
- Tighten the knob (26) of the handle’s up-
per support (23) (Fig. 13).
- Connect the power supply (27a) to the
auxiliary socket (27) (Fig. 14).
- Fit the nozzle (28) on the right part of the
machine, inserting the plate (33) inside
the casing (29) and the knob screw in the
dedicated (30) housing (31), then tighten
the knob (30) (Fig. 15).
- Make sure the nozzle (32) is in the hori-
zontal position. The spray angle is 120
degrees, the nozzle position may be
adjusted depending on specific require-
ments (Fig. 16).
2.2.d - Filling the tank (Fig. 17)
- Unscrew the tank (34) and remove it.
- Fill it with water and polishing wax.
For dosing, refer to the instructions pro-
vided by the manufacturer of the polish-
ing wax.
- Insert the suction tube (35) into the tank
(34) and fully tighten.
2.2.e - Paper dust collection bag as-
sembly (Figs. 18/19)
The machine is delivered with the bag al-
ready mounted.
- Lift the lid (36) and check that the bag
(37) is correctly positioned (Fig. 18).
- If the bag is not present, to mount it, after
having lifted the door (36), insert the suc-
tion tube (39) in the bag’s (37) hole (38)
(Fig. 18-19).
- Close the lid (36) which is held in position
with a magnet (Fig 18).
2.2.f - Electrical connection
- Connect the machine power cable to a
mains socket whose characteristics cor-
respond to those shown on the machine’s
technical data plate.
Summary of Contents for C150 U13 ERG
Page 7: ...0 7 52 51 47 45 50 Fig 20 41 48 46 45 46 43 42 44 42 41 49 53 54 55 40 Fig 21 ...
Page 8: ...0 8 58 Fig 22 Fig 25 Fig 24 Fig 23 59 57 57 56 60 ...
Page 10: ......
Page 20: ......
Page 30: ......
Page 40: ......
Page 50: ......
Page 60: ......
Page 70: ......
Page 80: ......
Page 90: ......
Page 100: ......
Page 110: ......
Page 111: ......