![Flomotion Systems 4001V Series Installation And Operation Manual Download Page 9](http://html1.mh-extra.com/html/flomotion-systems/4001v-series/4001v-series_installation-and-operation-manual_2306738009.webp)
4001V Peristaltic Pump O&M Manual
6. Note: Flomotion tubing segments are pre-cut to the correct length for installation.
7. Tighten hose clamps securely.
8. Re-install the roller assembly into the pumphead and torque roller assembly screw to 30 NT-M (265 lbf-
in) as shown on drawing at right.
9. Spread small amount of non-petroleum silicone grease on inner surface of hose (where rollers contact
hose).
10. Reinstall pumphead housing cover.
3.4 Tubing Connections
Tubing or pipe connections are made at the inlet and outlet of the pump using standard 1” NPT fittings.
See the drawing below.
Estimated Pumping Capacity
Tubing I.D.
1/2”
3/4”
1”
ml/rev*
99
171
296
Pressure rating PSI
60
30
30
Max Suction Lift (ft)
20
15
10
GPH @ 3-60 RPM*
4.7 - 109
8.1 - 189
14.1 - 329
*Actual flow rates may vary.
Flomotion Systems, Inc. 4001V SERIES
Pg. 9