21
14 Final checks/first use
14.1 Final Checks
Check that:
• The duct insulation is in accordance with the manual
and the technical documents. It is very important the
ducts from the unit are also effectively insulated so that
no condensation forms on or in the ducts. It is especially
important to check this if the ducts are to be boxed in.
• Ducts are connected to the right nipples – check against
the unit drawings below.
• Adjustments have been made in accordance with the
manual and project planning documents (documentation
of ventilation data).
• The unit operates normally at all stages.
• Heating switches in.
• The unit has filters for both outdoor air and extract air.
• Tumble dryers must not be connected to the unit.
The installer may be held liable for any incorrect
or defective installation.
Flexit SPIRIT K2 R, Right-hand model
For fitter
Flexit SPIRIT K2 R, Left-hand model
14.1 First use
• Check that the control panel has been connected.
• Plug the unit into the mains supply.
• The unit will now start.
• The unit will automatically perform a start-up procedure
lasting approx. 2 min.
• After the start-up procedure the unit will follow the settings
entered on the control panel.
• If it is wished to check or alter the settings, this can be
done from the control panel.
(See separate documentation for automatic control.)
Summary of Contents for Spirit K2R
Page 23: ...23 ...
Page 24: ...Flexit AS Televeien 15 1870 Ørje Norway www flexit com ...