Application planning
4.3 Application planning
38
Edition 10/2022
S6300-01en
4.3
Application planning
4.3 Application planning
4.3.1
Scope of delivery
4.3 Application planning
Information
sensors
The sensors are delivered according to the order.
Separate delivery is possible.
The sensors can also be supplied preinstalled on the gear unit ex works.
• control cabinet
• DX Site-Server
• Instructions
• Sensors including associated cables (optional)
4.3.2
Unpacking and checking the delivery
4.3 Application planning
NOTICE
Risk of property damage to the and connected devices
Damaged parts can cause property damage to the or connected devices.
•
Do not use any devices that show evidence of damage.
•
Check the complete scope of delivery for completeness before installation.
• Unpack the .
• Check the scope of delivery for completeness using the packing lists enclosed with the
control cabinet.
• Complain about any missing parts with exact details according to the packing list.
• Check the device for transport damage by visual inspection.
4.3.3
Location of use
4.3 Application planning
NOTICE
Risk of property damage to the and connected devices
Inadequate overvoltage protection can result in severe damage to the device.
•
Do not use any devices that show evidence of damage.
•
Check the complete scope of delivery for damages before installation.
•
Only use suitable overcurrent guards whose permissible switch-off times comply with
the expected fault or short-circuit current.
Summary of Contents for DX2000+
Page 1: ...Operating instructions S6300 01en Edition 10 2022 DX2000 ...
Page 6: ...Table of contents 6 Edition 10 2022 S6300 01en Index 79 ...
Page 8: ...List of figures 8 Edition 10 2022 S6300 01en ...
Page 10: ...List of tables 10 Edition 10 2022 S6300 01en ...
Page 14: ...Introduction 1 4 Copyright 14 Edition 10 2022 S6300 01en ...
Page 22: ...Safety information 2 12 Notes on special types of hazards 22 Edition 10 2022 S6300 01en ...
Page 40: ...Application planning 4 3 Application planning 40 Edition 10 2022 S6300 01en ...
Page 54: ...Commissioning 6 1 Commissioning 54 Edition 10 2022 S6300 01en ...
Page 58: ...Operator control 7 4 Faults 58 Edition 10 2022 S6300 01en ...
Page 64: ...Maintenance 8 6 Maintenance schedule 64 Edition 10 2022 S6300 01en ...
Page 66: ...Service Support 9 2 Technical return address 66 Edition 10 2022 S6300 01en ...
Page 68: ...Disposal 10 4 Scrapping 68 Edition 10 2022 S6300 01en ...
Page 70: ...Declaration of conformity EU Declaration of Conformity 70 Edition 10 2022 S6300 01en ...
Page 76: ...Technical specifications Environmental conditions 76 Edition 10 2022 S6300 01en ...
Page 78: ...Annex Software 78 Edition 10 2022 S6300 01en ...
Page 80: ...Index 80 Edition 10 2022 S6300 01en ...
Page 81: ......