![Flavor Burst CTP 80BEV-INT Operation Manual Supplement Download Page 39](http://html.mh-extra.com/html/flavor-burst/ctp-80bev-int/ctp-80bev-int_operation-manual-supplement_2303418039.webp)
38
11. Slide the coupler casing over the connection
and screw each coupler nut into each end of
the casing. Tighten the coupler nuts to
secure the connection.
12. Place the connection underneath the
electronics board shelf, not above.
DO NOT
PLACE THE 9-TUBE
ASSEMBLY AND LEAD CONNECTION
ABOVE THE SHELF. IF THE CONNECTION
BECOMES LOOSE OR IF THE SEAL
BECOMES WORN OVER TIME, LEAKAGE
COULD OCCUR AND COME IN CONTACT
WITH THE PUMP CABLE CONNECTIONS.
THIS MAY RESULT IN ELECTRICAL SHOCK
AND DAMAGE TO THE UNIT.
13. Position the 9-Tube Assembly tubes
through the slotted opening of the
electronics panel shelf.
14. Slide the integrated cabinet as far into the
Taylor cabinet as it will go with the lip of the
electronics panel hanging over the edge,
flush with the base of the Taylor cabinet.
Take care not to pinch any tubes or wires
that are under the electronics panel shelf.
Be sure the integrated cabinet is centered
between the sides.
15. Open the front door and slide each tray out
and in to ensure each one can be fully
removed. Do the same for the Sanitizer
Tank. Adjust the cabinet placement if
necessary.
16. Reinstall the side support bracket.
26236
26424
26425
26410
26409
26415