52
EQUIPMENT SETUP – Continued
Continue with the EQUIPMENT SETUP
instructions in your standard operations
manual(s). For systems flavoring two different
product types, refer to each type of manual for
setup on that freezer. For example, to install
the Spigot Switch on a freezer striping soft
serve product, refer to the CTP 80SS manual.
For switch setup on an FCB freezer, see the
CTP 80FCB manual. Perform the instructions
in the following sections of EQUIPMENT
SETUP:
Power Connections and Power Up
Installing Flavors and Priming Syrup
Lines
Color Touch Panel Overview
Consult your standard manual for important
information and instructions on these topics:
Daily Opening Procedures
Daily Closing Procedures
Replacing the Syrup Flavors
Scheduled
Maintenance
Color Touch Panel Overview
Directory of Cleaning Procedures
Parts Replacement Schedule
Recommended Maintenance Items
Replacement Schedule
Alternate Parts and Kits by Freezer
Model
Ordering Service Information
Consult your Color Touch Panel Manual for
detailed information and instructions on how to
manage your Color Touch Panel functions.
OTHER IMPORTANT INFORMATION
Summary of Contents for CTP 80BEV-DLX
Page 2: ...1 PAGE INTENTIONALLY LEFT BLANK...
Page 7: ...6 PAGE INTENTIONALLY LEFT BLANK...
Page 10: ...9 PAGE INTENTIONALLY LEFT BLANK...
Page 11: ...10 General Cabinet Overview Figure 1...
Page 16: ...15 PAGE INTENTIONALLY LEFT BLANK...
Page 17: ...16 Inner Cabinet Figure 3...
Page 26: ...25 PAGE INTENTIONALLY LEFT BLANK...
Page 27: ...26 CBB Blending Assembly and Related Parts Figure 4D...
Page 29: ...28 FCB Door Spout Assembly and Related Parts Figure 4E...
Page 33: ...32 Premium Beverage Syrup Pump and Related Parts Continued Figure 5C...
Page 35: ...34 Sanitizer Pump and Related Parts Continued Figure 6...
Page 37: ...36 Syrup Tray Sanitizer Tank 9 Tube Assembly Lead and Casing Figure 7...