
04
7. Take the build plate base out of the carton.
(Two-person operation is recommended)
9. Check parts of the tool box: tool kit, memory
card, screw bag, filament, ribbons, filament
fixed seat, filament support, T-type fixed seat
of Z-axis, T-type fixed seat of Z-axis+Sensor.
11. There are 4 screws of M5*25, 5 screws of M4*6,
4 screws of M4*8 and 8 set screws of M4*5
inside the screw bag.
8. Put build plate on the table and check all the
parts of the printer,no damage.
10. Take out the unclogging pin tool, grease, Allen
wrench, stamping wrench, PTFE tube inside
the tool kit.
Unboxing of profile machine completed.
Suggest to keep packing materials well for
further storage or transportation.
Summary of Contents for THOR300T
Page 21: ...20 3 Z T Z T 5 M5 25 4 M4 6 5 M4 8 4 M4 5 8 4 1 300T 2 6...
Page 22: ...21 11 9 10 7 8 12...
Page 23: ...22 1 400T 500T 2 3 5 4 6...
Page 24: ...23 7 8 9 Z T Z T 11 M5 25 4 M4 6 5 M4 8 4 M4 5 8 10...
Page 27: ...26 1 2 T 3 T T 4 T T 5 T 6 T...
Page 28: ...27 7 L L 8 L 9 M5 25 4 10 M4 5 L 4 8 11 T T T...
Page 29: ...28 12 M4 8 T 4 13 T 14 15 M4 6 16...
Page 30: ...29 17 M4 6 18 19 Z Steeper Z Z 20 X Steeper X X X...
Page 31: ...30 21 Z 23 X Max X X X 24 25 26 22 Z Z T...
Page 32: ...31 2 x 120mm 3 X 4 X 6 5 1...
Page 33: ...32 7 Tools Home Yes Thor 4 Print Preheat Tools...
Page 34: ...33 8 A4 A4 Thro...
Page 35: ...34 3 Filament 4 load 1 2 Tools 5 Extruder 100 Cancel Print Preheat Tools...
Page 38: ...37 1 2 3 4 5 6...
Page 39: ...38 7 8 1 2 2mm...
Page 40: ......