Flash Technology
Revision A - 2/13/2020
40
CHECK-OUT PROCEDURE
LIGHTING INSPECTION (LI) OVERVIEW
The FTC 270 has a built in test procedure to aid in performing Lighting Inspections (LI). The automated test
eliminates the need to disconnect any wires from the unit to test alarm points. The lighting inspection can be
performed as an automatic function or manually.
AUTOMATIC LIGHTING INSPECTION
The following procedure will run through all alarm points without any user interaction. The alarms tested during
this inspection type will be based off the system configuration.
1.
From the main menu, scroll DOWN to
“Lighting Inspections” and press ENTER.
2.
Scroll to “Automatic LI” and press ENTER
3.
Scroll to “Begin Test” and press ENTER
4.
The display screen will indicate when the test
is complete.