35 |
P a g e
LED LIGHT INSTALL AND POWER
It is best if LED lights are connected and tested during the initial stages of installation to allow easy access under the
unit (before the wall finishing material is done).
Testing the LED light requires a 110V power source.
Installation steps:
1.
Remove all LED components from the shipping bag.
2.
Components are pre-connected prior to shipping. Connect LED connectors (points
A
) to the fireplace using
the quick connect connectors.
3.
Connect LED control system to the power supply (point
B
)
4.
Connect LED Power supply to an external power source (point
C
). Do not connect the LED to the Flare control
LED plug at this point. Use the LED remote to turn the LED on the LED system.
Once testing is done, connect the LED power adapter to final power source (Point
C
), Option 1 or Option 2 as
detailed in the previous page.
Power outlet on the Flare control is optional for LED ONLY