INSTRUCTION MANUAL
Electrical winches LM90A/LM250A
Réf : 1813000156
Page :
6/17
Version : 23/21
2
Installation and Use
2.1
Instructions for installation, assembly,
commissioning and use - training
Les opérations
d’installation et
d’utilisation doivent
Installation and use operations must be performed
by personnel specially trained by the manufacturer
or its dealers, duly authorised by their employer.
Depending on your country, regulatory inspections
may be necessary.
Make sure you have:
-
a sufficient length of special cable Ø5 mm
-
an adequate length of supply cable and
suitable number of wires with suitable cable
section,
-
Accessories you may wish to use
The reaction in the anchorage of hoist and/or
pulley are different according your installation;
check your case with a qualified technician :
2.1.1
Suspended installation
It's the simplest mounting and the most common.
Device in suspension and direct traction or lifting.
The anchoring of the device must be done
exclusively by its hook and never by its handle.
There is no way to anchor the hook of the cable to
the fixed point to get the device moving on the
cable.
The hook of the machine must be placed in the
body of the attachment point, so that this body is at
bottom of hook. The pawl
of safety of the hook must
close completely.
If a gene appears in the
articulation of the apparatus
with the body of fixing
hook, it is necessary to
interpose
a
sling
of
appropriate capacity.
Check each element
of connection capabilities
to ensure your safety.
2.1.2
Installation with deflection
- Device suspended ; indirect traction or lifting.
This case requires a deflection pulley anchored to a
fixed point.
- Device on ground and lifting through a deflection
pulley.
(
this is not a reeving; refer to §2.1.4)