background image

fitech ag

 Switzerland 

Operating Manual 

page 6

  

 

fitech

-Flowmeter 

 

 

 

Cleaning 

 
With the conclusion of the flow measurements, the Flowmeter is to be thoroughly cleaned. 

Follow these steps:  

-

 

Ensure that the Flowmeter is not under pressure by making certain that hand valve (Pos. 
8)  is  in  OFF-position.  Make  sure  reading  on  pressure  gage  is  nill,  then  remove 

compressed air connection. 

-

 

Unscrew  all  manually  screwed  parts  (nozzle,  nozzle  carrier  and  measuring  cylinder), 

remove pressure plate. 

-

 

Use only cleaning agents that are compatible with the product measured and which will 

not harm any of the metal parts, especially the pressure plate. 

-

 

Clean the threads of the parts, including the pressure cylinder, thoroughly. It is important 

however,  that  the  threads  are  greased  again  prior  to  remounting  the  parts.  Use  only 

grease which does not contain any parts of Silicon and which will not react with products 

to be measured. Remount cleaned and greased parts as indicated under 'Preparation for 

measurements'. 

Your Flowmeter is now ready for further measurements, store in a well protected and clean 

spot.  

 



 

 
Please  call  us  in  case  of  any  questions  or  queries  you  might  have  connected  with 

these operating instructions. We will endeavour to assist you as much as possible.  
 
 
Telephone No.  

+41 (0) 71 414 72 10 

 
Fax No. 

 

+41 (0) 71 414 72 20  

 

 

 

[email protected]

 

 

Your

 

 
 

fitech ag 

 

Buchenhölzlistrasse 3 

 

CH-8587 Oberaach 

 

Switzerland  

Summary of Contents for PM 43

Page 1: ...L for the fitech Flowmeter PM 43 Flow measuring equipment Type PM 4300 29 N Equipment No 13 780 29 Prior to the first use please follow the instructions under the CLEANING section of this Operating Ma...

Page 2: ...hapters Subjects page Applications of the fitech Flowmeter 3 Introduction to the Operating Manual 3 Safety operation and maintenance 3 Place of operation 4 Operation 4 Preparation for measurements 4 M...

Page 3: ...to personnel working with it should operating instructions not be followed Fitech excludes any responsibility for damages or injuries whatsoever that may result from non compliance with or non compreh...

Page 4: ...area thoroughly and implements additional safety measures if necessary Operation Prior to its first operation the following points must be checked All screwed connections are fastened tightly either m...

Page 5: ...e an air leak CAUTION The parts mentioned nozzle nozzle carrier measure and pressure cylinders are precision parts with very fine threads When screwing together take care not to set threads canted aga...

Page 6: ...s especially the pressure plate Clean the threads of the parts including the pressure cylinder thoroughly It is important however that the threads are greased again prior to remounting the parts Use o...

Page 7: ...cooling jacket 90 40 50 4 Nozzle carrier 27 60 M12 5 Nozzle 2 6 mm H7 Nozzle 4 mm H7 6 Pressure plate B 39 9 21 7 Pressure gage R 0 to 6 bar 0 6 160 8 Hand valve VHB 3 2 9 Pressure regulator R A 1000...

Page 8: ...fitech ag Switzerland Operating Manual page 8 fitech Flowmeter...

Reviews: