background image

 
 
 
 
 
 
 

 

 
 

OPERATING MANUAL

 

 

for the 

 

fitech 

 

 

Flowmeter PM 43 

 

 

Flow measuring equipment 

 

 

 
 

Type: 

PM-4300-29-N 

 
Equipment No. 

13 780.29 

 

 

 
 

Prior to the first use, please follow the instructions under the  

 

 “CLEANING” section of this Operating Manual on page 6!  

 

Summary of Contents for PM 43

Page 1: ...L for the fitech Flowmeter PM 43 Flow measuring equipment Type PM 4300 29 N Equipment No 13 780 29 Prior to the first use please follow the instructions under the CLEANING section of this Operating Ma...

Page 2: ...hapters Subjects page Applications of the fitech Flowmeter 3 Introduction to the Operating Manual 3 Safety operation and maintenance 3 Place of operation 4 Operation 4 Preparation for measurements 4 M...

Page 3: ...to personnel working with it should operating instructions not be followed Fitech excludes any responsibility for damages or injuries whatsoever that may result from non compliance with or non compreh...

Page 4: ...area thoroughly and implements additional safety measures if necessary Operation Prior to its first operation the following points must be checked All screwed connections are fastened tightly either m...

Page 5: ...e an air leak CAUTION The parts mentioned nozzle nozzle carrier measure and pressure cylinders are precision parts with very fine threads When screwing together take care not to set threads canted aga...

Page 6: ...s especially the pressure plate Clean the threads of the parts including the pressure cylinder thoroughly It is important however that the threads are greased again prior to remounting the parts Use o...

Page 7: ...cooling jacket 90 40 50 4 Nozzle carrier 27 60 M12 5 Nozzle 2 6 mm H7 Nozzle 4 mm H7 6 Pressure plate B 39 9 21 7 Pressure gage R 0 to 6 bar 0 6 160 8 Hand valve VHB 3 2 9 Pressure regulator R A 1000...

Page 8: ...fitech ag Switzerland Operating Manual page 8 fitech Flowmeter...

Reviews: