www.eu.fishersci.com/fisherbrand
17
3 SYSTEM START UP AND OPERATION
3.1 Check List Prior to System Start Up
Prior to system start up, use the table below to make sure all parts have been
installed and connected, and quality of feed water meets minimal requirements.
Check List
Results
Feed Water quality – purified water
Water temperature: 5 - 45
o
C
Feed Water connection
Power cord connection
AccuQuatro U Pack cartridge installed
Dispenser installed