517794B
20
If the meter shows an incorrect reading, we would recommend testing the stator from underneath
the machine, as there could be a fault in the wiring harness. To test the stator it will need to be
removed from the machine (refer to Section 17.12).
8.4.2
Testing SmartPump™ At The Stator
After removing the stator it can be tested.
To test across all windings you will need to
measure across the
centre
and the
two outer
terminals.
Note: Do not measure using the two inner
terminals as these are not used.
If an incorrect reading is obtained, remove the
stator shield and inspect the stator. Ensure that
the three spade terminals are fitted correctly
and have not been dislodged.
If the fault cannot be remedied, the entire pump
assembly must be replaced.
16.2
Ω
Summary of Contents for WL26CW1
Page 2: ...517794B 2...
Page 30: ...517794B 30 16 WIRING DIAGRAM...
Page 40: ...517794B 40...
Page 41: ...517794B 41 19 NOTES...