35
@1
INSTALL TOE KICK
4
Place the toe kick in front of the mounting plate. Ensure that the spacers at back of the toe
kick are aligned with the magnets (
E
).
– For custom toe kick, skip step
3
as spacers are not needed.
5
Attach the toe kick by pressing onto the mounting plate (
F
).
–
For stainless steel:
Ensure the adhesive tape of the magnets adhere to the spacers of
the toe kick.
– Ensure the bottom of the toe kick contacts the floor as you attach to the mounting plate.
IMPORTANT!
Two magnets are pre-installed to the bottom corners of the toe kick mounting plate. Each
magnet has double-sided tape to be attached to the toe kick. This allows both Stainless
steel and Custom panels to be attached to the magnet.
Required components/tools:
●
●
1x Air toe kick seal
●
●
1x Toe kick
Installing the toe kick mounting plate and toe kick
1
If the toe kick depth is less than 3 5/8” (92mm), attach the air toe kick seal (
A
) to the
middle of the back side of the mounting plate (
B
).
2
Attach the toe kick mounting plate (
C
) to the plinth.
F
3
Peel off the adhesive tape backing of the magnets located at the front bottom
corners of the toe kick mounting plate (
D
).
D
E
B
A
C
IMPORTANT!
●
●
For toe kick heights 4 1/2” – 5” (114 – 127mm), shorten the lower grille by cutting along
the vertical ribs.
●
●
For 2” (51mm) toe kick height, an additional lower grille can be ordered.
●
●
For toe kick heights greater than 5” (127mm), lower grille is not required.
●
●
Refer to ‘Door and toe kick panel dimensions’ for more information.