General Instructions and Regulations
Seite/Page 16 - Kaptitel/Chapter 1: General Instructions and Regulations
30.10.12
1.3
Manufacturer declaration in accordance with the Machinery Directive
98/37/EC
Manufacturer declaration in accordance with the Machinery Directive 98/37/EC
The generator was designed in such a way that all assemblies correspond with the
CE guidelines
. If Machinery
Directive 98/37/EC is applied, then it is forbidden to start the generator until it has been ascertained that the system
into which the generator is to be integrated also complies with the Machinery Directive 98/37/EC. This includes the
exhaust system, cooling system and electrical installations.
The evaluation of „protection against contact“ must be carried out when installed, in conjunction with the respective
system. This also includes correct electrical connections, a safe ground wire connection, foreign body and humidity
protection, protection against moisture due to excessive condensation, as well as overheating through appropriate
and inappropriate use of the equipment in its installed state. The responsibility for implementing these measures lies
with those who undertake the installation of the generator in the final system.
1.4
Customer registration and guarantee
Use the advantages of registering your product:
• you will receive a Guarantee Certificate after approval of your installation data
• you will receive extended product information that may be relevant to safety.
• You will receive free upgrades as necessary.
Additional advantages:
Based on your complete data record, Fischer Panda technicians can provide you with fast assistance, since 90% of
the disturbances result from defects in the periphery.
Problems due to installation errors can be recognized in advance.
1.4.1 Technical support
Technical Support via the Internet: [email protected]
1.4.2 Caution, important information for start-up!
1. The commissioning log shall be filled in immediately after initial operation and shall be confirmed by signature.
2. The commissioning log must be received by Fischer Panda GmbH at Paderborn within 4 weeks of initial
operation.
3. After receiving the commissioning log, Fischer Panda will make out the official guarantee certificate and send it to
the customer.
4. If warranty claims are made, the document with the guarantee certification must be submitted.
If the above requirements are not or only partly fulfilled, the warranty claim shall become void.
Summary of Contents for 5000i PVK-U
Page 36: ...Seite Page 36 Panda_5000i_PVMV N_Book_eng R02 30 10 12 Leere Seite Intentionally blank Basics...
Page 48: ...The Panda Generator Seite Page 48 Kaptitel Chapter 4 The Panda Generator 30 10 12...
Page 126: ...Generator Tables Seite Page 126 Kaptitel Chapter 8 Generator Tables 30 10 12...
Page 150: ...Page 150 Chapter 11 Installation 30 10 12 Intentionally left blank Installation...
Page 152: ...Page 152 Chapter 12 Maintenance 30 10 12 Intentionally left blank Maintenance...
Page 158: ...Page 158 Chapter 14 Annex 30 10 12 Intentionally left blank Annex...