![First Innov PRIMAPROTECT User And Installation Notice Download Page 6](http://html1.mh-extra.com/html/first-innov/primaprotect/primaprotect_user-and-installation-notice_2293774006.webp)
User notice Primaprotect
version 1.0
6
3 INSTALLATION
A correct installation is imperative for a good operation of the system. Read carefully the
following instructions.
NB : It is advised to have a professional install and maintain your alarm system.
Your central unit Primaprotect must be installed in such way that it can not be moved with
bare hands (without appropriate tools).
Use an adapted drill with a 12 mm
diameter bit, an electric or a regular Phillips screwdriver
For your installation, do not start drilling right away.
Illustration 5 :Tools needed for your installation
3.1 Positioning the posts:
Illustration 6 : Example of installation around a rectangular swimming pool
Position the master post n°1 and slave posts n°2, n°3 and n°4 clockwise as indicated in
the drawing above. The number corresponding to the post is indicated on the top of the
post , next to the cells.
Each post comprises 4 windows behind which the transmitting and receiving infrared cells
are located. Make sure that the infrared cells are facing each other as shown in the
drawing above.
The maximum distance between two posts cannot exceed 20m and cannot be inferior to
3m.
Master post n°1
Slave post n°2
Slave post n°3
Slave post n°4
Summary of Contents for PRIMAPROTECT
Page 14: ......