15
a cm
h cm
w cm
T2MC18 56
34
125
T2MC28 56
46
125
T3MC18 76
34
166
T3MC28 76
46
166
T4MC18 56
34
125
T4MC28 56
46
125
T6MC18 76
34
166
T6MC28 76
46
166
5.6. Checks before start up
Turn on the main switchboard.
Turn on the (1/0) switch
, program a temperature over 200°C , set
both the power regulators at 9 and turn on the
(Start/stop)
switch.
Check that the current to each phase is that indicated in chapter 3 ,
for the corresponding feed voltage.
Set the both power regulators at 5 and check that their lights go
on and off at intervals.
Turn off the switches
(start/stop) and
and the main switch,
placed on the switchboard.