© 2022 Carrier
6
NECESSARY COMPONENTS FOR A COMPLETE SYSTEM
Individual components HEP-2 with flexible cable in front of the ignition electrode
HEP-2-Z0750 or HEP-2-Z100 (Highest level, complete system)
HEP-2-PP
- Portable high-energy hand-held ignitor with device plug, mains cable and carrying strap
HEP-2-C-1.5
- Ignition cable with handle, ignition tip adapter with high-voltage cable
HE-SSR-0.0
- Ignition tip adapter
HE-S / HE-L
- Ignition tip short / long (to be selected depending on the required overall length)
ET 0.0X
- Extension tube (to be selected depending on the required total length)
Adjustment of the immersion depth of the ignition electrode above 525mm is made by using optional extension
tubes ET 0.XX and selecting ignition tips HE-S (screwed in 200mm) or HE-L (screwed in 675mm).
Please note that the red high voltage cable is shortened to the required length in the junction box only after all
components have been assembled.
NOTICE:
Due to the pre-assembled high-voltage cable, the electrode length is usually 3 m and can be longer if required.
In this case, please contact Fireye.
WARNING: ATTENTION HIGH VOLTAGE!
Before mounting, replacing the ignition tip or opening the ignition unit, it is absolutely necessary to switch off the
high-energy ignition unit in order to prevent unintentional ignition. Due to the discharge time of the capacitors,
work on the ignition electrode as well as opening the cover may be carried out at the earliest 120 seconds after
the supply voltage has been switched off.
In addition, at least the safety instructions on page 3 must be observed.
The electrical connection may only be carried out by a qualified electrician.
HEP-2-PP
HEP-2-C-1.5
Includes HE-SSR-0.0.
HE-S
HE-L
HE-SSR-0.0
ET 0.XX