4. ASSEMBLY INSTRUCTIONS

 

1  

 

  Carefully remove all packaging.

 

2

 

The  firebox  front  when  installed  must  be  flush  with  the  finished  fireplace       
surround and on a level base of the same height as the finished floor protector.  
This may be achieved by using a concrete mix to level the base.

 

3

 

Slide the firebox into the opening so that the outer casing return folds are flush 
with the finished fireplace surround.

 

4

 

It  is  important  to  anchor  the  fire  box  down  in  case  of  movement.  Restraint 
points are provided through the fires two front legs.

 

5

 

Install Flue as per instructions on page 9 and 10.

 

6

 

Now  that  the  Firebox  and  Flue  are  in  position, 

place  25mm  white  Kaowool 

blanket

 

(supplied) on top of casing

.

 

7

 

As  this fire  sources  its  combustion air from  the  chimney  cavity/enclosure, 

the 

fire  MUST  be  sealed  around  the  front  between  the  casing  and  the          
masonry.  This is achieved by packing the yellow ISB insulation supplied 
between  the  casing  and  the  masonry  at  the  FRONT  ONLY  to  maximum 
depth of 80mm. As shown on pages 12 and 13.

 

8

 

Assemble and fit the fascia as per instructions on the relevant pages 15

-

23.

 

 

NOTE:  

 

           In the case of some insert fires into existing masonry fireplaces it may be     

necessary to install additional ventilation into the chimney cavity as per 
AS/NZ 2918 3.4.1.2 to assist air flow into the fire.  This  ventilation should 
not be taken/drawn from the room that the fire is  installed in.

 

Summary of Contents for Topaz RURAL

Page 1: ...e use of a NZ Home Heating Association solid fuel Fire installation technician SFAIT or other suitably qualified person The Fire and Flue System must be installed in accordance with AS NZS2918 All Ins...

Page 2: ...t of Flue System Outlet 11 12 7 Typical Insulation Requirement 13 24 8 Clearances Floor Protector for a Zero Clearance Box Built In Fire Canopy 25 Installation of Kaowool ISB Insulation 26 Assembly In...

Page 3: ...AEROSOLS in the vicinity of this FIRE when it is operating Use caution when reloading with fuel Do NOT attempt to load fuel into the Fire when the fire inside the stove is at or near its peak Do NOT b...

Page 4: ...facturer should be consulted in the first instance Strict adherence to these instructions will meet these standards Any variation from these installation instructions or any doubt about them must be c...

Page 5: ...heat sensitive materials in its construction it must meet the following MINIMIUM dimension as marked A B from Diagram above A 300mm from breast of fire to outer edge of concrete floor protector heart...

Page 6: ...nt to check the condition of your masonry chimney Ensure any cracks are sealed loose masonry repaired and the chimney swept Check the dimensions of your fireplace opening are adequate to accept the ne...

Page 7: ...and 10 6 Now that the Firebox and Flue are in position place 25mm white Kaowool blanket supplied on top of casing 7 As this fire sources its combustion air from the chimney cavity enclosure the fire M...

Page 8: ...The chimney plate must be weather sealed with silicone or mortar 4 Install chimney liner on top of the chimney plate 5 Ensure flue is extended over the chimney liner by 180mm Secure top spacer bracke...

Page 9: ...Topaz RU Installation April 2019 9 6 INSERT FLUE SYSTEM FOR INSTALLATION IN A ZERO CLEARANCE BOX BOX Built in Fire Canopy...

Page 10: ...f the floor protec tor 2 The flue cowl must be at least 600mm above the highest point of the roof if within 3 metres of it or 1 metre above the roof penetration if more than 3 metres from the ridge 3...

Page 11: ...nstallation April 2019 11 7 TYPICAL INSULATION REQUIREMENTS FOR MASONRY Vent 50x100 minimum 450 Minimum Gap so Fascia fits is 300mm If lower than 150mm Insulated Hearth required If greater than 150mm...

Page 12: ...nd masonry enclosure at the FRONT ONLY to a maximum depth of 80mm UNDER NO CIRCUMSTANCES SHOULD THE AIR SUPPLY INTO THE AIRPORTS ON THE SIDE OF THE FIRE BE RESTRICTED SIDE PILLAR CLEARANCE The minimum...

Page 13: ...Built in Fire Canopy A ZERO CLEARANCE BOX Built in Fire Canopy IS REQUIRED IF THE FIRE IS NOT BEING INSTALLED INTO A MASONRY FIREPLACE For built in Zero Clearance Box Built in Fire Canopy installatio...

Page 14: ...Topaz RU Installation April 2019 14 ZERO CLEARANCE BOX Built in Fire Canopy...

Page 15: ...Topaz RU Installation April 2019 15 ZERO CLEARANCE BOX Built in Fire Canopy...

Page 16: ...Topaz RU Installation April 2019 16 ZERO CLEARANCE BOX Built in Fire Canopy...

Page 17: ...Topaz RU Installation April 2019 17 1350 1355 1000mm 1460 300 min 1000mm 300 min 700 min ZERO CLEARANCE BOX Built in Fire Cano...

Page 18: ...Topaz RU Installation April 2019 18 700mm to Ceiling ZERO CLEARANCE BOX Built in Fire Canopy...

Page 19: ...Topaz RU Installation April 2019 19 1000 ZERO CLEARANCE BOX Built in Fire Canopy...

Page 20: ...Topaz RU Installation April 2019 20 ZERO CLEARANCE BOX Built in Fire Canopy...

Page 21: ...Topaz RU Installation April 2019 21 ZERO CLEARANCE BOX Built in Fire Canopy...

Page 22: ...learance to framing all round Zero clearance must sit on 40mm base provided Zero Flue starter must be used Minimum height to first framing 700mm The minimum height must be 300mm Minimum height to ceil...

Page 23: ...of 20mm of Insulation board Promatech H Eterpan LD Pacbld Pro or product of similar thermal resistance and tiles slate or similar with sealed joints on top surface to protect from spilt ash embers FLO...

Page 24: ...the clearance from the top of the fire box to the ceiling is no less than 1500mm The ash floor protector must be of a minimum of 450mm from the fire breast the width must be no less than 840mm Positio...

Page 25: ...Topaz RU Installation April 2019 25 INSTALLATION OF KAOWOOL AND ISB INSULATION IN A ZERO CLEARANCE BOX Built in Fire Canopy...

Page 26: ...EALAND BEING AN EARTHQUAKE PRONE COUNTRY IT IS IMPORTANT TO ANCHOR THE INSERT DOWN IN CASE OF MOVEMENT Restraint points are provided through the fires two front legs See diagram below 6 Install Flue a...

Page 27: ...or carefully and place small pieces then larger logs on top 6 Close door tight and leave Air Control on HIGH for some 30 minutes The value in establishing this technique is that you are providing an e...

Page 28: ...st empty Fire set at the same position Remember you only get out of any Fire what you put into it The better the fuel the better the Fire Do NOT burn plastic household refuse or driftwood This will vo...

Page 29: ...d on the paintwork use Stovebright Metallic Black paint to retouch taking note of the manufacturer s instructions for spraying Never spray a hot fire FIRE BRICKS The internal fire bricks on the sides...

Page 30: ...material for the glass should be replaced at this time also NEVER place glass directly against the door Without the insulation seal tape in place the glass is likely to shatter Your Firenzo Dealer wi...

Page 31: ...arantees Act 1993 To the fullest extent permitted at law no other warranties or guarantees express or implied are assumed or given by Firenzo to any person with respect to the quality merchantability...

Page 32: ...ered by the warranties or the entire Firenzo wood fire at its discretion where Firenzo is reasonably satisfied a defect is solely due to faulty Firenzo workmanship or materials 14 Firenzo may decline...

Page 33: ...y questions about the warranties or this document please contact Firenzo at its specified address on telephone 06 8438260 by email at firenzo firenzo co nz or via the Firenzo website www firenzo co nz...

Page 34: ...core Lady Kitchener Napier Viking Vision Insert Aqualux Athena Bay Flush Forte Bay Flush Kompact Athena Kompact Deco Kompact Diva Kompact Forte Kompact Plaza Kompact Serenity Topaz 98 Niven Street PO...

Reviews: