
Topaz RU Installation
-
April 2019
13
8. TOPAZ IN A ZERO CLEARANCE BOX
(Built
-
in Fire Canopy)
A ZERO CLEARANCE BOX
-
(Built
-
in Fire Canopy) IS REQUIRED IF THE FIRE IS
NOT BEING INSTALLED INTO A MASONRY FIREPLACE
For built in Zero Clearance Box
-
(Built
-
in Fire Canopy) installations see the following
pages.
ZE
R
O
C
LE
A
R
A
N
C
E
B
O
X
-
(
B
ui
lt
-
in Fi
re
C
an
op
y)
Summary of Contents for Topaz RURAL
Page 14: ...Topaz RU Installation April 2019 14 ZERO CLEARANCE BOX Built in Fire Canopy...
Page 15: ...Topaz RU Installation April 2019 15 ZERO CLEARANCE BOX Built in Fire Canopy...
Page 16: ...Topaz RU Installation April 2019 16 ZERO CLEARANCE BOX Built in Fire Canopy...
Page 18: ...Topaz RU Installation April 2019 18 700mm to Ceiling ZERO CLEARANCE BOX Built in Fire Canopy...
Page 19: ...Topaz RU Installation April 2019 19 1000 ZERO CLEARANCE BOX Built in Fire Canopy...
Page 20: ...Topaz RU Installation April 2019 20 ZERO CLEARANCE BOX Built in Fire Canopy...
Page 21: ...Topaz RU Installation April 2019 21 ZERO CLEARANCE BOX Built in Fire Canopy...