Topaz RU Installation
-
April 2019
6
3B. FLOOR PROTECTOR REQUIREMENTS
HEAT SENSITIVE FLOORS
Dimensions A & B from above diagram must meet the following schedule:
B HEIGHT (mm) A FROM FIRE BREAST
Level
Ømm
500mm
30mm
376mm
40mm
355mm
50mm
300mm
Minimum width of floor protector must be 820mm and/or 410mm from centre of Fire.
Before installing your Firenzo Topaz it is important to check the condition of your masonry
chimney. Ensure any cracks are sealed, loose masonry repaired and the chimney swept.
Check the dimensions of your fireplace opening are adequate to accept the new Fire Existing
linings may need to be removed.
The Fire must be installed on a level non
-
combustible base.
An
Insulated
Floor Protector
(Hearth) must consist of a
minimum
of
20mm
of
Insulation board
(Promatech H,
Eterpan LD, Pacbld
-
Pro or
product of similar thermal
resistance) and tiles/slate or
similar with sealed joints on top
surface to protect from spilt
ash/embers.
Summary of Contents for Topaz RURAL
Page 14: ...Topaz RU Installation April 2019 14 ZERO CLEARANCE BOX Built in Fire Canopy...
Page 15: ...Topaz RU Installation April 2019 15 ZERO CLEARANCE BOX Built in Fire Canopy...
Page 16: ...Topaz RU Installation April 2019 16 ZERO CLEARANCE BOX Built in Fire Canopy...
Page 18: ...Topaz RU Installation April 2019 18 700mm to Ceiling ZERO CLEARANCE BOX Built in Fire Canopy...
Page 19: ...Topaz RU Installation April 2019 19 1000 ZERO CLEARANCE BOX Built in Fire Canopy...
Page 20: ...Topaz RU Installation April 2019 20 ZERO CLEARANCE BOX Built in Fire Canopy...
Page 21: ...Topaz RU Installation April 2019 21 ZERO CLEARANCE BOX Built in Fire Canopy...