
Topaz RU Installation
-
April 2019
22
IMPORTANT:
Heat resistant cladding
must be used up to the
ceiling height.
Zero Clearance box
must have 30mm
clearance to framing all
round.
Zero clearance must
sit on 40mm base
provided
Zero Flue starter
must be used
Minimum height to
first framing 700mm
The minimum height
must be 300mm
Minimum height to
ceiling from top of
Zero Clearance Box
200mm
450
Ash Hearth
The Fire in the Zero Clearance Box is 1000mm and framing must have 30mm clear all round.
Summary of Contents for Topaz RURAL
Page 14: ...Topaz RU Installation April 2019 14 ZERO CLEARANCE BOX Built in Fire Canopy...
Page 15: ...Topaz RU Installation April 2019 15 ZERO CLEARANCE BOX Built in Fire Canopy...
Page 16: ...Topaz RU Installation April 2019 16 ZERO CLEARANCE BOX Built in Fire Canopy...
Page 18: ...Topaz RU Installation April 2019 18 700mm to Ceiling ZERO CLEARANCE BOX Built in Fire Canopy...
Page 19: ...Topaz RU Installation April 2019 19 1000 ZERO CLEARANCE BOX Built in Fire Canopy...
Page 20: ...Topaz RU Installation April 2019 20 ZERO CLEARANCE BOX Built in Fire Canopy...
Page 21: ...Topaz RU Installation April 2019 21 ZERO CLEARANCE BOX Built in Fire Canopy...