Kalea Bay Outdoor Fireplace
REV. 4-17-19 Page 21
FINAL PREPARATION
When the fireplace is framed into position and the gas line is run in place it is recommended to burn test the fireplace
before the finish work is complete. This will ensure proper operation and enables the installer to check for any gas leaks
at the fireplace.
NOTE
:
The pilot covers have a plastic film that must be removed before installing.
Once the burner pan assembly is secured into position, the pilot covers must be installed (one on each side). After you
have removed the plastic film install the pilot covers into the open slot of each burner end (spacers that center the burner)
with the open side of pilot cover facing toward the fireplace side wall (See Figures 21-22).
NOTE:
Even though there is
no pilot on the opposite end the other pilot cover provides combustion air evenly to the burner for
operation.
Fig. 22
Pilot cover installed.
Bu
rn
er
Fireplace Side Wall
Pilot C
over
No media allowed
in shaded area
Fig. 21
Installing pilot cover.
Fireplace Side Wall
Pilot Cover
Bu
rn
er
Burner E
nd
REMOVE PLASTIC FILM
FROM PILOT COVER
No media allowed
in shaded area