Version: August 2020
18
Step 6: Connect gas supply and commission
•
Gas installation, connection and commissioning must meet the requirements of AS/NZS 5601.1:2013
and be installed and certified by a suitably qualified person.
• In order to access the gas supply and testing area, it is necessary to first remove the glass and the burner
tray.
•
Follow the ‘
Glass installation
process‘
in this guide.
•
Remove the burner tray by following the ‘
Burner tray
removal process
’ in this guide.
•
Connect 3/8 soft copper pipe to main valve.
•
Leak test all joints.
•
The GD12 models have for each glass panel a safety
switch, at the base of each lower opening. The safety
switch turns the appliance off if the glass is not in the
right position. The safety switch will need to be held
down to complete electrical testing. It is recommended
that masking tape is used to hold the safety switch
down
•
Switch the wall isolation switch to the appliance ON.
•
Using the remote control, switch the appliance ON,
following the
‘GD12 Operating Instructions’
in this
guide.
•
Test pressure against rating plate specifications.
•
Using the remote control, switch the appliance OFF,
following the
‘GD12 Operating Instructions’
in this
guide.
•
In the unlikely event that the rating plate is not attached,
Do Not
commission the appliance and contact The
Fire Dept immediately.
•
Install the burner tray by following the
‘Burner Tray Installation Process’
in this guide.
•
Using the remote control, switch the appliance ON, following the
‘GD12 Operating Instructions’
in this
guide.
Note
: due to lack of firebed and glass, it may be necessary to manually light burners.
•
Using the remote control, switch the appliance OFF, following the
‘GD12 Operating Instructions’
in this
guide.
•
Switch the wall isolation switch to the appliance OFF
• Lay firebed in accordance with instructions in Step 7 of this guide.
•
NOTE
: The masking tape must be removed once testing is completed.
• Carefully install glass by following the ‘
Glass installation
process‘
in this guide.
• Send gas certificate to appropriate person.
Safety switch