Fineco Electric EM737 User Manual Download Page 3

 

                                                                                                                                                                                       

User Manual EM737   

                                                                                                                                                                                                                              Document code: Fineco737-1-1.1 Revision2.003   

Shanghai fangqiu electric CO.,LTD.                                                                                                                                                      Email: 

[email protected]

 

                                                                                                                                                                                                                                           

1.

 

Safety notice 

Th

e smart energy meter of EM737 does not require special mechanical or electrical 

tools for its installation. Mounting position (with any angle of tilt) has no effect on the 

measurement functions of th

e meter. 

Connecting of the meter must be made according to applicable wiring diagram. Incorrect 

connection of the meter to the electricity network causes major display problem and can 

also  causes  serious  damage  to  the  meter.  Before  starting  meter  operation,  it  must  be 

ensured the local conditions of the energy system are consistent with data on the nameplate 

of  the  meter.  Preferably  use  for  the  connection  of  shielded  cables.  Make  sure  that 

connecting cables are not damaged during installation of the meter are not energized and 

free of non-mechanical stress. 

    Repairs when removing the cover of the meter, which is also under tension can be made 

only  by  a  qualified  electrician  who  is  familiar  with  the  associated  risks.  Capacitors  in  the 

meter may still be charged even if the meter is disconnected from all energy sources. 

 

2.

 

Content of delivery 

    Three phase, electronic energy meter, instructions for assembly   

ID setting

 

Baud rate setting   

CT rate setting 

 

Password setting 
 
 

3.

 

EC Type Examination Certificate       

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for EM737

Page 1: ...o EN50470 3 LCD display 6 integer 2 decimal Large clear back light display Electrical measurements Volts L1 L2 L3 N Amps L1 L2 L3 Neutral kW kvar kVA PF L1 L2 L3 Frequency kWh kvarh kW kvar Demand Iso...

Page 2: ...chnical description 5 1 Performance criteria 5 2 Meter specification 5 3 Dimensions and sealing points 6 Wiring diagrams 7 Meter reading 8 Main function 8 1 Measuring Function 8 2 Display function 8 3...

Page 3: ...tarting meter operation it must be ensured the local conditions of the energy system are consistent with data on the nameplate of the meter Preferably use for the connection of shielded cables Make su...

Page 4: ...storage temperature 25 C 55 C 1K4 Humanity 75 yearly average 95 on 30 days year International standard EN50470 3 IEC62053 21 Accuracy class Class B Protection against penetration of dust and water IP5...

Page 5: ...circuits VA 0 01 Power consumption of voltage circuits W 1 3W General data Frequency Hz 50 Memory back up EEprom Environment resistance to heat and fire Terminal 960 Cover 650 upper ABS PC lower ABS...

Page 6: ...ulse output and the communication interface RS 485 However depending on the ordering number of the energy meter only some terminals of the energy meters are involved 1 2 L1 in out 3 4 L2 in out 5 6 L3...

Page 7: ...1 Voltage L1 Y N 4 0010 2 Voltage L2 Y N 4 0012 3 Voltage L3 Y N 4 0014 4 Current L1 Y N 4 0016 0050 5 Current L2 Y N 4 0018 0052 6 Current L3 Y N 4 001A 0054 7 Current N Y N 4 001C 0056 8 Total curre...

Page 8: ...2 FF06 Settings No Comments Read Write Bytes Starting address 36 Modbus id Y Y 2 0524 37 Baud rate Y Y 2 0525 Lcd content Description of LCD symbols displayed Symbol Description kWh active energy kW...

Page 9: ...ances with communication equipment and Energy meters to preventing signal reflection and interference 3 Communication circuit should keep distance with Large current circuit and shall not be parallel...

Page 10: ...he Password Password to default 8888 9 2 ID setting After the Password authentication the meter will display the ID XX setup interface As the following picture Id 00 it means the current ID address is...

Page 11: ...the password Use page down and page up button to input password as you want After 30 seconds the meter will save the password you changed Remarks 1 Do not forget the password you setup 2 Please press...

Reviews: