Mains Supply & Batteries

 

 

The Fire Alarm Panel 230V AC supply requires fixed wiring between 0.75 mm

2

 and 2.5 mm

2

, a 3 amp fused 

un-switched spur with local isolation, to be terminated into the fused terminals provided in the power supply 
back  box.  The  mains  supply  should  be  dedicated  to  the  Fire  Alarm  Panel  and  should  be  clearly  labelled 
‘FIRE ALARM: DO NOT SWITCH OFF’ at all isolation points. 
 
The standby will vary depending on the system loading. The PSU requires 2 x 12V 17Ah sealed lead acid 
batteries. These are to be sited in the power supply back box in the provided enclosure along the bottom 
edge.  The  batteries  should  be  connected  in  series  using  the  connection  leads  supplied.  We  recommend 
the use of type Yuasa NP17-12I (FR) or other equivalent approved type. 
 
Do  not  use  larger  or  smaller  capacity  batteries  on  this  system, larger batteries will not fully charge in the 
time allowed and smaller ones will be overcharged and the service life will be reduced.  
 

Using different capacity or type of batteries could also invalidate any warranty. 

 
Note  that  batteries  are  electrically  live  at  all  times  and  great  care  should  be  taken  to  ensure  that  the 
terminals  are  never  presented  with  a  short  circuit.  Care  should  be  taken  at  all  times,  especially  during 
transit, installation and normal use.  
 

Use caution as there is a risk of explosion if the batteries are replaced by an incorrect type. 

 
Batteries  no  longer  required  should  be  disposed  of  in  a  safe  and  environmentally  friendly  manner  by  the 
battery manufacturer or a suitable recycling service. They should never be incinerated or placed in normal 
rubbish collection facilities. Dispose of used batteries according to the instructions. 
 

 

 

Knockouts at top and rear 
 
 

Field Wiring Connections 

 
 

 
 
 
 

2 x 12V 17Ah sealed  
lead acid batteries 

 
 
 

 

12V 17AH 

BATTERY 

12V 17AH 

BATTERY 

CHARGE  

CONTROLLER 

SWITCHED 

MODE PSU 

Summary of Contents for Quadnet PSU V3

Page 1: ...26 0853 Issue 5 Fire Detection Alarm System Power Supply Unit V3 Power Supply Unit Installation Manual TO BE RETAINED BY THE COMMISSIONING ENGINEER...

Page 2: ...of such contents Due to the complexity and inherent importance of a life risk type system training on this equipment is essential and commissioning should only be carried out by competent persons Fike...

Page 3: ...tallation 7 Physical Dimensions 8 Power Supply Assembly 8 Topology and Cabling 9 Cable Specification 9 Mains Supply Batteries 10 PSU Termination Schematic 11 PSU Terminals 12 Address Select Links 15 E...

Page 4: ...ganisation Anti Static Handling Guidelines Immediately prior to handling any PCBs or other static sensitive devices it is essential to ensure that a personal connection to earth is made with an anti s...

Page 5: ...ed intelligence signifies that the signal processing is spread throughout the system in order that the decisions about fires and faults are taken within the detector itself The detector is capable of...

Page 6: ...PSU Earlier models differ slightly The power supply is normally supplied disassembled to make first fix easier If the panel is already assembled it must be disassembled in order to fix the backbox to...

Page 7: ...ting At least four of the five mounting holes should be used to secure the cabinet to a solid wall using suitable screws of at least 50mm in length A gap of at least 50mm should be left between this e...

Page 8: ...Quadnet Power Supply Unit Installation Manual 8 Physical Dimensions Power Supply Assembly This is the reverse of the disassembly process above 50mm 50mm 420mm 420mm FLUSH MOUNT HOLE IN WALL...

Page 9: ...ontrol panel for 24V DC power connections if each cable is no longer than 6 3m use 2 5 mm 2 for 24V DC power cables up to a maximum of 9 5m In order to protect against possible data corruption it is i...

Page 10: ...acity batteries on this system larger batteries will not fully charge in the time allowed and smaller ones will be overcharged and the service life will be reduced Using different capacity or type of...

Page 11: ...Quadnet Power Supply Unit Installation Manual 11 PSU Termination Schematic NOTE The diagram above shows a V3 PSU Earlier models differ slightly...

Page 12: ...elay NO NC COM The Fault relay is a single pole change over volt free relay contact The relay contacts are rated at 30V DC 1A max All inductive loads should be diode protected to prevent back EMF Howe...

Page 13: ...r to V3 backplane PCB Issue 3 do not have twin power connections for an external PSU or the facility for monitoring comms with an external PSU so it is recommended that no external PSU is used with th...

Page 14: ...Description A Serial Data connection A B Serial Data connection B SCRN Cable Screen connection PSE COMMS A B SCRN The Secondary PSU must be installed adjacent to the main Power Supply unit The PSE CO...

Page 15: ...RS For normal Quadnet systems where only one PSU is used with the panel the PSU s address must be set to 0 or 1 If connecting secondary PSUs to the Quadnet system the main PSU should be address 1 and...

Page 16: ...cated on the Charge Controller Unit Fuse No Label Fuse Type Breaking Capacity Max Rated Voltage FUSE1 Input from SMPS 10A T Glass 100A 250VAC FUSE2 Battery 10A T Glass 100A 250VAC FUSE3 Mains Input Li...

Page 17: ...e installer needs to provide a set of As Wired drawings and proof of cable continuity and insulation test readings etc to enable commissioning to proceed This information is essential for commissionin...

Page 18: ...ot followed Battery Data Make a clear note by labelling of the batteries of the installation date and the battery voltage The battery voltage should be taken for each battery with the 230V AC mains su...

Page 19: ...Charging Voltage Current Details Ripple and noise 2 x 17Ah 12V sealed lead acid batteries 230V AC nominal 31V 19V 0 5R max internal resistance 350mA min output current 5 5A max output current 27 3V 2...

Page 20: ...a Power 1 Power 2 ve to ve with temp short circuit applied ve to Earth with temp short circuit applied ve to Earth with temp short circuit applied A reading of approximately 1 ohm per 100 metres of 1...

Page 21: ...Quadnet Power Supply Unit Installation Manual 21 Your Notes...

Page 22: ...Quadnet Power Supply Unit Installation Manual 22 Your Notes...

Page 23: ...Quadnet Power Supply Unit Installation Manual 23 Your Notes...

Page 24: ...to the appropriate terminals at both ends For PSU connections to control panels install two power connection cables and one data connection cable Leave a copy of the User Instructions by the control p...

Reviews: