background image

 

 

Page 7

SYSTEM CONTROL CHECK OUT PROCEDURES  

1. For furnaces or boilers, adjust the thermostat to call for heat and observe the power venting system for proper 

operation sequence. (Repeat if necessary) 

a.  Thermostat calls for heat. 
b.  Relay is energized and venter motor starts. 
c.  Pressure switch closes and burner starts. 
d.  Thermostat is satisfied, the burner stops. 
e.  This starts the post purge cycle. Purge time 1 to 2 min. 

2.  While system is operating, disconnect power to the venter motor. This should open the pressure switch contacts and 

stop burner operation. 

TROUBLE SHOOTING HINTS 

1.  Venter does not activate when thermostat calls for heat. 

a. Check 

wiring. 

b.  Check for 24 volts between T1 and T2 on the CK-41F control kit.  
c.  If there is 24 volts replace post purge timer. 

2.  Flue gas odor. 

a.  Check system draft. 
b.  Check for negative pressure in building. 

REPAIR AND REPLACEMENT PARTS 

REPAIR AND REPLACEMENT PARTS LIST

DESCRIPTION 

PART NUMBER 

Pressure Switch 

46083000 

Post Purge Timer 

46282800 

Reviews: