After proper air flow is established, the pressure switch 
adjustment is made by turning the pressure switch 
adjustment screw clockwise (See Figure 4) until burner 
operation stops. Turn the adjustment screw counter 
clockwise until burner ignites. Turn the adjustment 
screw an additional ¼ to ¾ turn counterclockwise to 
ensure adequate switch adjustment. 

WARNING:

 Failure to properly adjust the 

pressure switch as specified above could lead 
to improper operation of the pressure switch, 
which will result in a hazardous condition and 
bodily harm! 

T

HERMOSTAT 

H

EAT 

A

NTICIPATOR 

A

DJUSTMENT

 

After venting kit installation and checkout, check the 
amperage current draw through the thermostat circuit 
and adjust the thermostat anticipator accordingly. 

W

IRING 

I

NSTRUCTIONS

 

CAUTION: DISCONNECT ELECTRICAL POWER WHEN WIRING POWER VENTER, 

Wire the venter motor and controls in accordance with the National Electrical Code, manufacturer's recommendations 
and/or applicable local codes. UNITS MUST BE GROUNDED. Check ground circuit to make certain that the unit has been 
properly grounded. The wiring should be protected by an over-current circuit device rated at 15 amperes. CAUTION must 
be taken to ensure that the wiring does not come into contact with any heat source. All line voltage and safety control 
circuits, between the venter and the appliance, MUST be wired in accordance with the National Electrical Code for class 
one wiring or equivalent methods. Route the venter motor and control wiring with an appropriate wiring method. Refer to 
Wiring Diagrams. 

L

OW 

V

OLTAGE 

W

IRING 

I

NSTRUCTIONS 

F

OR 

B

OILERS 

A

ND 

W

ARM 

A

IR 

F

URNACES

 

1.  With boilers, locate terminal on spark ignition module or gas valve, (if standing pilot) which would normally be 24 volts 

hot on a call for heat. With spark ignition systems, this terminal could be TH-W or 24 V depending on the spark 
ignition control. 

2.  With warm air furnaces, locate terminal W in furnace junction box. 

3.  Remove wire from this terminal and reroute to T1 on CK-41F. 

4.  With boilers, connect T3 on CK-41F to hot side of gas valve (if standing pilot) or to terminal TH-W or 24 V, if spark 

ignition. 

NOTE:

 

Remember, the correct terminal is the one that would normally be hot on a call for heat. 

5.  With warm air furnaces, connect T3 on CK-41F to terminal W in furnace junction box. 

6.  Connect T2 on CK-41F to a 24 volt neutral on transformer or where convenient, or to the C terminal in the furnace fan 

center. 

L

INE 

V

OLTAGE 

W

IRING 

I

NSTRUCTIONS

 

1.  Connect 120 volts hot power source wire to terminal L1 on CK-41F. 

2.  Connect 120 volts neutral power source wire and white wire from venter motor to terminal N on the CK-41F. 

3.  Connect black wire from venter motor to terminal M on the CK-41F. 

R

EFER TO THE 

SWG V

ENTER INSTALLATION INSTRUCTIONS FOR SETTING SYSTEM AIRFLOW

Figure 4