L1 to 1 on post purge timer 

T2 to timer relay base 

M to 3 on post purge timer 

T3 to N/O on pressure switch 

T1 to common on pressure switch Timer base to common on pressure switch 

L

OW 

V

OLTAGE 

W

IRING 

I

NSTRUCTIONS 

F

OR 

B

OILERS 

A

ND 

W

ARM 

A

IR 

F

URNACES

 

1.  With boilers, locate terminal on spark ignition module or gas valve (if standing pilot) which would normally be 24 volts 

hot on a call for heat. With spark ignition systems, this terminal could be TH-W, 24 V, THS or T1 depending on the 
spark ignition control. 

2.  With warm air furnaces, locate terminal W in furnace junction box. 
3.  Remove wire from this terminal and reroute to T1 on CK-92F. 
4.  With boilers, connect T3 on CK-92F to hot side of gas valve (if standing pilot) or to terminal TH-W, 24 V, THS or T1 if 

spark ignition. 

NOTE:

 

Remember, the correct terminal is the one that would normally be hot on a call for heat.

 

5.  With warm air furnaces, connect T3 on CK-92F to terminal W in furnace junction box. 
6.  Connect T2 on CK-92F to a 24 volt neutral where convenient. 

L

INE 

V

OLTAGE 

W

IRING 

I

NSTRUCTIONS

 

1.  Connect 120 volts hot power source wire to terminal L1 on CK-92F. 
2.  Connect 120 volts neutral power source wire and white wire from venter motor to terminal N on the CK-92F. 
3.  Connect black wire from venter motor to terminal M on the CK-92F. 

Refer to the SWG Venter installation instructions for setting system airflow. 

Diagram B

Summary of Contents for 46285400

Page 1: ...witch and post purge timer 1 Fan control gas pressure switch with built in post purge option 1 2 ft length of 1 4 inch aluminum tubing 1 1 8 NPT x 3 inch pipe nipple 1 1 8 NPT x 1 4 inch OD tubing elb...

Page 2: ...2F junction box or installer supplied junction box onto the wall or floor joist without straining the flexible conduit Fasten the CK 92F junction box through the four dimpled locations on the base of...

Page 3: ...s supply to gas valve before plug removal 2 Replace the pressure tap plug with the 1 8 pipe nipple and pipe tee Install pressure tap plug at the bottom of the pipe tee See Figure 6 3 Install the gas p...

Page 4: ...er when wiring power venter Wire the venter motor and controls in accordance with the National Electrical Code manufacturer s recommendations and or applicable local codes UNITS MUST BE GROUNDED Check...

Page 5: ...wire from this terminal and reroute to T1 on CK 92F 4 With boilers connect T3 on CK 92F to hot side of gas valve if standing pilot or to terminal TH W 24 V THS or T1 if spark ignition NOTE Remember th...

Page 6: ...wer to the gas pressure switch 2 Adjust the thermostat to call for heat with the venter inoperative Allow approximately 2 minutes of flue gas spillage for the spillage switches to sense the spillage a...

Page 7: ...__ INSTALLER S NAME _____________________________________________________ INSTALLER S COMPANY _________________________________________________ INSTALLER S PHONE NO ___________________________________...

Page 8: ...Page 8 P N 46285400 Rev C 10 03...

Reviews: