6. Appliance Installation
Rack Installation
Install each appliance in an enclosure/location that has necessary power and cooling. Ensure that the
installation environment is within the operating temperature of the appliance. See
appliance operating temperature requirements.
Power
Connect power cables to the power supplies in the back of the appliance. See
power requirements.
Network Cabling
Using the connectors and cables described in sections 3 and 4, begin to connect the appliances to the
networks. Cable the Collector SA appliance(s) to the switches:
1. Connect the Admin (eth0) port to the Admin switch port.
2. Optionally, connect the iLO port to the Admin (or iLO) switch port.
7. Appliance Network Configuration
Start the Appliance Network Configuration
1. Power on the appliance(s).
2. Connect to the component CLI using either of the following:
‒
Via KVM Console. see
Option 1: Connect to the Component CLI Using KVM Console
‒
Via iLO, see
Option 2: Connect to the Component CLI Using iLO
Option 1: Connect to the Component CLI Using KVM Console
1. Connect a keyboard and monitor to the appliance.
2. Continue with
Complete the Appliance Network Configuration
Option 2: Connect to the Component CLI Using iLO
iLO supports DHCP by default. If you need a static IP address, before performing this procedure, first
follow
Configuring iLO to Use a Static IP Address
1. Log into the iLO console:
https://<
IP address
>
where <
IP address
> is the iLO IP address