9 FIBERONDECKING.COM
Please contact 1-800-230-7547 for further assistance.
Line Rail Installation (continued)
10
Installing the balusters and top rail
□
Install all balusters into the bottom rail.
□
Seat the balusters into the top rail and press down on the
brackets to snap/lock the top rail into place.
□
Pre-drill two holes in the flange at the bottom of the
bracket (AA) 2 in. deep with a 5/32 in. bit.
□
Secure the top rail using two #10 x 2 in. screws (GG).
DO NOT OVERTIGHTEN THE SCREWS.
GG
AA
11
For installations higher than 30 in.
above grade
□
Two additional screws are required to properly secure the
top rail. Predrill a 5/32 in. hole perpendicular into the flat
face of the bracket (AA), approximately 1/2 in. from the post.
□
Drive #10 x 1 in. screws (DD) until fully seated. DO NOT
OVERTIGHTEN THE SCREWS.
□
Insert screw caps (EE) onto the heads of the #10 x 1 in.
screws (DD).
DD
DD
EE
EE
12
Installing the post caps
□
Complete the installation by installing the post cap in place.
You can use a quality exterior adhesive in order to do this
but note that you will not be able to remove the cap at a
later time once it is glued.