![fiberon ARMORGUARD SEC19 CW 6KD Installation Manual Download Page 7](http://html1.mh-extra.com/html/fiberon/armorguard-sec19-cw-6kd/armorguard-sec19-cw-6kd_installation-manual_2286754007.webp)
7 FIBERONDECKING.COM
Please contact 1-800-230-7547 for further assistance.
Line Rail Installation
1
Preparing the bottom rail
□
Place the bottom railing bracket (BB) over the ends of the
bottom rails.
□
Center the crush block on the deck surface between posts.
Set the bottom rail on top of the crush block and ensure
the rail is level.
BB
2
Tracing the bottom railing bracket
□
Lightly trace a line to show the location of the bottom of
the bracket (BB).
BB
3
Attaching the bottom bracket flange
□
Remove the bottom rail and mark the bottom bracket
flange (CC) holes.
□
Pre-drill holes using a 5/32 in. bit and then attach the
bottom bracket flange (CC) using the #10 x 1.5 in. screws
(FF). DO NOT OVERTIGHTEN THE SCREWS.
CC
FF
4
Installing the bottom rail
□
Snap/lock the bottom rail in place.
5
Attaching crush blocks
□
Use PVC adhesive to place and glue crush blocks (1) to the
bottom of the bottom rail at mid-point of rail length for 6 ft.
and at 1/3 points of rail length for 8 ft. to support the rail in
a level position.
1