11 FIBERONDECKING.COM
Please contact 1-800-230-7547 for further assistance.
Stair Railing Installation (continued)
5
Preparing the bottom rail installation
□
Place the lower rail and brackets in place, and locate and
mark the screw holes.
□
Remove the rail and brackets, and pre-drill with a
5/32 in. bit.
6
Installing the bottom rail
□
Secure the bottom rail using the #10 x 1.5 in. screws (LL).
DO NOT OVERTIGHTEN THE SCREWS.
□
Transfer the stair angle to the crush block and cut to the
desired length.
□
Place the crush block on the stair tread surface midway
between the posts and glue to bottom of bottom rail.
LL
7
Positioning the top rail
NOTE:
Baluster length may vary slightly. Make sure all
balusters are cut to the correct length.
□
Insert a baluster into the first and last holes in the bottom
rail. Carefully position the top rail over the balusters. Lower
until the balusters are fully inserted.
□
With the top rail fully seated, and using the top bracket as a
guide, mark the location of the holes.
8
Drilling the top rail holes
□
Remove the rail before pre-drilling the holes.
□
Predrill the holes with a 5/32 in. bit.