
Page
11
of
28
Use of Auto Fill Pass-Thru machines
1.
Switch the machine on (red switch), then switch the auto-fill and lights on (green
switches).
2.
The machine should be left for 20 minutes to allow it to reach the correct operating
temperature. By having an automatically filling water system the internal atmosphere
of the unit will be humid, improving the “hold time” that products can be kept for.
3.
Whenever the flaps are raised on the Pass Thru unit they should also be lowered in a
controlled manner and not allowed to drop and bang against the side of the
machine. Allowing the flaps to hit the machine can result in damage to the doors but
more importantly weaken the bulbs and reduce their life.
4.
Ensure that the water supply is maintained – otherwise the machines humidity will
be affected.
Summary of Contents for Vizu 400 Pass Through Multi Stack
Page 5: ...Page 5 of 28...
Page 14: ...Page 14 of 28 Wiring Diagram...
Page 25: ...Page 25 of 28 Notes...
Page 26: ...Page 26 of 28 Notes...
Page 27: ...Page 27 of 28 Notes...