(For Qualified Service Technicians Only) 

 

Keys To A Successful Installation 

If not installed correctly by qualified personnel, the brewer will not operate properly and damage may result.  
Damages resulting from improper installation are not covered by the warranty. 
Here are the key points to consider before installation: 
 

Electrical:  

 

All FETCO brewers require 

NEUTRAL

.  Ground is not an acceptable substitute.  Installation without neutral 

may cause damage to the electronic components. 

 

The electrical diagram is located on the inside of the lower cover. 

 

The installation must comply with applicable federal, state, and local codes having jurisdiction at your 
location.  Check with your local inspectors to determine what codes will apply. 

 

Plumbing:  

 

This equipment is to be installed to comply with the applicable federal, state, or local plumbing codes. 

 

The water line must be flushed thoroughly prior to connecting it to the brewer to prevent debris from 
contaminating the machine. 

 

Before connecting it to the brewer, verify that the water line pressure is 20 – 75 psig and the flow rate 
meets the following minimum requirements: 

CBS-2031ee: ½  gpm 

CBS-2041ee: 1  gpm 

CBS-2032ee: 1  gpm

 

CBS-2042ee: 1 ½ gpm

 

General: 

 

Utilize only qualified beverage equipment service technicians for installation.  A Service Company Directory 
may be found on our web site, 

http://www.fetco.com

 
 

Installation Instructions 

 

Brewer Setup  

1.  Review the Dimensions for the unit you are installing.  Verify that the brewer will fit in the space intended for it, 

and that the counter or table will support the total weight of the brewer and dispensers when filled. 

2.  The brewer’s legs are shipped inside the brew baskets.  

Remove the brew basket(s) and the coffee dispenser(s).  
Place the brewer on its back and screw in the legs. 

3.  Place the brewer on the counter or stand. 
4.  When the brewer is in position, level it front to back as well 

as side to side by adjusting the legs. 

5.  Remove the lower cover to access the water and electrical connections.  Knock-outs are provided in the back 

and base of the brewer body for the connections. 

 

Water Connection

 

1.  Water inlet is a 3/8 inch male flare fitting. 
2.  The brewer can be connected to a cold or hot water line.  Cold water is preferred for best coffee flavor, but hot 

water will allow for faster recovery times. 

3.  Install a water shut off valve near the brewer to facilitate service.  If an in-line water filter is used, it should be 

installed after the water shut off valve and in a position to facilitate filter replacement. 

4.  Flush the water supply line and filter 

before

 connecting it to the brewer. 

5.  Verify that the water line meets the pressure and flow requirements listed above. 

 

Electrical Connection – US & Canada 

1.  Verify that the actual voltage at the electrical service connection is compatible with the specifications on the 

brewer’s serial number label.  Make sure the electrical service includes 

neutral

2.  The temperature and water tank fill level are pre-set at the factory.  There is no need to turn off the heaters 

during the installation process.  The heaters are disabled by the control board until the tank is full of water.  The 
heating process will start automatically when the tank has filled. 

3.  The CBS-2031ee and CBS-2041ee models are factory equipped with a 120 V cord and plug.  The CBS-

2032ee and 2042ee have only a terminal block for connecting the incoming power wires. Consult local codes to 
determine if a cord and plug can be installed, or if the unit must be hard wired.  

             

Warning: Legs are to be adjusted for 

                  leveling the brewer only.  Do not use 
                  for height adjustment or extend them 
                  higher than necessary. 

Summary of Contents for CBS-2031ee

Page 1: ...ntents Contact Information 2 Description Features 2 Specifications 2 Requirements 2 Weights and Capacities 2 Electrical Configuration and Brewing Efficiency 3 Dimensions Utility Connections 4 Installa...

Page 2: ...les Within these cycles the software calculates how long to spray water over the coffee grounds and how long to pause before the next cycle begins Features Two fully programmable batch sizes per side...

Page 3: ...08 single 3 ground 4 6 22 4 14 6 22 0 120 220 5 1 23 7 16 3 22 0 120 240 6 1 25 8 19 4 22 0 CBS 2041ee 1 0 gallon per batch Electrical Heater Voltage Maximum Batches per Hour max 11 Config Code Config...

Page 4: ...4 Dimensions Utility Connections CBS 2031ee DWG 201141 000 CBS 2032ee DWG 201142 000...

Page 5: ...5 CBS 2041ee DWG 201143 000 CBS 2042ee DWG 201144 000...

Page 6: ...coffee dispenser s Place the brewer on its back and screw in the legs 3 Place the brewer on the counter or stand 4 When the brewer is in position level it front to back as well as side to side by adj...

Page 7: ...per fill levels The brewer is factory set with water only no coffee to dispense the correct amount of water If the actual volume is slightly different from the programmed volume fine tuning the brewer...

Page 8: ...urn the power switch on 2 Prepare a brew basket with the correct size filter and appropriate amount of coffee 3 Slide the brew basket completely into the rails 4 Place a clean empty preheated dispense...

Page 9: ...erature settings 7 200 See next page Important After programming you must press and hold the STOP button until the display reads STO to save the settings and exit programming mode or changes will be l...

Page 10: ...Range Default Comment 50 Water Level in Tank 0 1 Tests if water is touching probe 0 Tank is less than full 1 Tank is full 51 Water Resistance K 0 200 Displays the electrical resistance of the water in...

Page 11: ...d and the switch light will go out Brew switches are named S1 S2 S3 etc The left STOP switch must be pressed last as this will exit the test 65 Relay Test 0 Tests the individual relays that control va...

Page 12: ...nds Possible leak in tank fitting or valve Check inside of machine for leaks 102 Unwanted Fill When brewer is idle the fill valve was activated for more than 30 seconds during a 1 hour period Water su...

Page 13: ...found on our web site http www fetco com Cleaning Maintenance Daily Wipe the area above the brew baskets to remove coffee residue Daily or Weekly Clean the Cascading Spray Domes with a soft brush and...

Page 14: ...14 Parts Figure 1 CBS 2031ee Main Assembly DWG 101269 B...

Page 15: ...22 4 73029 LEG THERMOPLASTIC 2 50 63mm 23 1 104094 ASSEMBLY TANK CBS 2031ee O RING FITTINGS SEE FIG 2 24 1 22125 INSULATION TANK FRONT CBS 2031ee 25 1 22063 INSULATION TANK BACK CBS 2031e 26 1 45097...

Page 16: ...HOSE ID 8 1 24098 O RING 9 16 X 3 4 3 32 WIDTH 9 1 13135 NUT FOR 1 2 HOSE ID FITTING 10 3 83084 WASHER 875 OD X 536 ID FLA 22 GA 11 2 25098 FITTING COMPRESSION MALE CONNECTOR 12 1 25128 FITTING 90 DE...

Page 17: ...17 Figure 3 CBS 2032ee Main Assembly DWG 101270 B...

Page 18: ...8 MPT 25 1 86040 CONNECTOR CABLE CLAMP 3 4 26 1 54026 PROBE TEMPERATURE 5 LONG 50k 27 1 K028 WATER LEVEL PROBE REPLACEMENT CBS 2030 S 28 2 102195 ASSEMBLY BUMPER 2030e 29 1 25140 TUBE 5 8 OD X 3 8 ID...

Page 19: ...FITTING 1 2 HOSE ID 9 1 24098 O RING 9 16 X 3 4 3 32 WIDTH 10 1 13135 NUT FOR 1 2 HOSE ID FITTING 11 4 83084 WASHER 875 OD X 536 ID FLA 22 GA 12 2 25098 FITTING COMPRESSION MALE CONNECTOR 13 2 25128...

Page 20: ...20 Figure 5 CBS 2041ee Main Assembly DWG 101272 B...

Page 21: ...078 FITTING S 53 FILL VALVE INLET 23 1 03074 BRACKET S 53 24 4 82020 SCREW S 53 FILL VALVE 25 1 31031 FITTING 90 MALE ELBOW 3 8 TUBE OD X 3 8 MPT 26 1 86040 CONNECTOR CABLE CLAMP 3 4 27 1 51089 0BOARD...

Page 22: ...HOSE ID 8 1 24098 O RING 9 16 X 3 4 3 32 WIDTH 9 1 13135 NUT FOR 1 2 HOSE ID FITTING 10 3 83084 WASHER 875 OD X 536 ID FLA 22 GA 11 2 25098 FITTING COMPRESSION MALE CONNECTOR 12 1 25128 FITTING 90 DE...

Page 23: ...23 Figure 7 CBS 2042ee Main Assembly DWG 101271 B...

Page 24: ...TROL 100 120VAC DUAL 23 8 29007 NUT 4 40 KNURLED THUMB 24 3 73002 LEG FLANGE FOOT 4 HIGH 25 1 45100 OVERLAY CBS 2042ee 26 1 44004 LABEL GROUND 27 1 K029 WATER LEVEL PROBE REPLACEMENT CBS 2040 S 50 S 2...

Page 25: ...FITTING 3 8 HOSE ID 9 1 24098 O RING 9 16 X 3 4 3 32 WIDTH 10 1 13135 NUT FOR 1 2 HOSE ID FITTING 11 4 83084 WASHER 875 OD X 536 ID FLA 22 GA 12 2 25098 FITTING COMPRESSION MALE CONNECTOR 13 2 25128...

Page 26: ...HANDLES PART DESCRIPTION 23169 BREW BASKET HANDLE RED 23171 BREW BASKET HANDLE GREEN ITEM QTY PART DESCRIPTION 1 1 09021 WIRE INSERT 13 X 5 2 2 82118 HANDLE SCREW 3 1 23074 BREW BASKET HANDLE BLACK 4...

Page 27: ...20 VAC CSD 3 6 Part 102357 ITEM QTY PART DESCRIPTION 1 1 102378 ASSEMBLY HOUSING SPRAY W MAGNETS CSD DIA 3 6 2 1 24075 O RING 801 ID X 1 16 CROSS SEC 3 1 102214 ASSEMBLY DISPENSE VALVE RPE 120V 60Hz 4...

Page 28: ......

Reviews: