4. Commissioning
4−3
Festo P.BE−MPAL−EN en 1008NH
4.1
General Information
4.1.1
Prior to commissioning
·
Switch off the power supply before connecting or discon
necting plug connectors (otherwise functional damage).
·
Only commission a valve terminal that has been mounted
and wired completely.
·
Make sure that there is a sufficient supply of fresh air
(cooling) for the following operating conditions:
When the maximum number of valves are fitted
When the maximum operating voltage is applied
When the solenoid coils are constantly under stress
·
Note the specifications concerning the medium.
4.1.2
Pressure build−up in the overall supply
Warning
If the pressure build−up of the pilot air supply is too slow
or delayed, this may cause the actuators to perform
sudden unexpected movements under the following condi
tions:
When the compressed air is connected via a soft−start
valve (gradual pressure build−up) and
If there are electric signals (e.g. after EMERGENCY STOP)
This can cause damage to the machine or system and even
injury to persons.
·
Operate the valve terminal with an external pilot air
supply (3 ... 8 bar). Branch the pilot air supply before
the soft−start valve (see Fig.4/1).
Summary of Contents for MPA-L Series
Page 2: ......
Page 8: ...Contents and general safety instructions VI Festo P BE MPAL EN en 1008NH ...
Page 15: ...Overview of components 1 1 Festo P BE MPAL EN en 1008NH Chapter 1 ...
Page 40: ...1 Overview of components 1 26 Festo P BE MPAL EN en 1008NH ...
Page 41: ...Mounting 2 1 Festo P BE MPAL EN en 1008NH Chapter 2 ...
Page 55: ...Installation 3 1 Festo P BE MPAL EN en 1008NH Chapter 3 ...
Page 85: ...Commissioning 4 1 Festo P BE MPAL EN en 1008NH Chapter 4 ...
Page 100: ...4 Commissioning 4 16 Festo P BE MPAL EN en 1008NH ...
Page 101: ...Conversion and maintenance 5 1 Festo P BE MPAL EN en 1008NH Chapter 5 ...
Page 128: ...5 Conversion and maintenance 5 28 Festo P BE MPAL EN en 1008NH ...
Page 129: ...Technical appendix A 1 Festo P BE MPAL EN en 1008NH Appendix A ...
Page 141: ...Supplementary overview of components B 1 Festo P BE MPAL EN en 1008NH Appendix B ...
Page 150: ...B Supplementary overview of components B 10 Festo P BE MPAL EN en 1008NH ...
Page 151: ...Index C 1 Festo P BE MPAL EN en 1008NH Appendix C ...
Page 152: ...C Index C 2 Festo P BE MPAL EN en 1008NH Contents C Index C 1 ...