Contents and general safety instructions
XIII
Festo P.BE-CTEU-EC-OP+MAINT-EN en 1208NH
Term/abbreviation
Meaning
Load voltage
includes the power supply for connected devices and outputs, e.g.
solenoid coils of valves (load voltage supply as distinct from operating
voltage supply for electronics and sensors)
LSB
Byte with the lowest importance (Least Significant Byte)
MDP
Information model in which hardware and software components are
represented as individual modules (Modular Device Profile)
MSB
Byte with the highest importance (Most Significant Byte)
O
Digital output
OB
Output byte
Object directory
makes all important participant parameters accessible in a standard-
ised manner
PDO
Process Data Objects provide fast transfer of process data and are
transmitted by simple EtherCAT messages with no protocol overhead.
Process Data Objects may be transmitted based on event control, syn-
chronised to a system clock, or on request.
PLC
Programmable Logic Controller, same as SPS
Power supply
Umbrella term for operating and load voltage supplies
SDO
Service Data Objects form point-to-point connections between the
server and client, primarily for the exchange of parameters for device
configuration. These permit write and read access to any entry in the
object directory of a bus node.
TwinCAT
Beckhoff configuration and programming software
(TwinCAT: The Windows Control and Automation Technology)
Tab. 0/3:
Specific terms and abbreviations – part 2
Summary of Contents for CTEU-EC
Page 2: ......
Page 16: ...Contents and general safety instructions XIV Festo P BE CTEU EC OP MAINT EN en 1208NH...
Page 17: ...Installation 1 1 Festo P BE CTEU EC OP MAINT EN en 1208NH Chapter 1 Installation...
Page 34: ...1 Installation 1 18 Festo P BE CTEU EC OP MAINT EN en 1208NH...
Page 35: ...Commissioning 2 1 Festo P BE CTEU EC OP MAINT EN en 1208NH Chapter 2 Commissioning...
Page 60: ...2 Commissioning 2 26 Festo P BE CTEU EC OP MAINT EN en 1208NH...
Page 61: ...Diagnostics 3 1 Festo P BE CTEU EC OP MAINT EN en 1208NH Chapter 3 Diagnostics...
Page 82: ...3 Diagnostics 3 22 Festo P BE CTEU EC OP MAINT EN en 1208NH...
Page 83: ...Technical appendix A 1 Festo P BE CTEU EC OP MAINT EN en 1208NH Appendix A Technical appendix...
Page 103: ...Index B 1 Festo P BE CTEU EC OP MAINT EN en 1208NH Appendix B Index...
Page 104: ...B Index B 2 Festo P BE CTEU EC OP MAINT EN en 1208NH Contents B Index B 1...
Page 109: ...B Index B 7 Festo P BE CTEU EC OP MAINT EN en 1208NH U User instructions X X X1 X2 LEDs 3 6...
Page 110: ...B Index B 8 Festo P BE CTEU EC OP MAINT EN en 1208NH...